flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Goettsch Partners unveils design for mega mixed-use development in Shenzhen [slideshow]

Goettsch Partners unveils design for mega mixed-use development in Shenzhen [slideshow]

The overall design concept is of a complex of textured buildings that would differentiate from the surrounding blue-glass buildings of Shenzhen.


By Goettsch Partners | August 19, 2014
Renderings courtesy of Goettsch Partners
Renderings courtesy of Goettsch Partners

Architecture firm Goettsch has been hired by developer China Resources Land Limited to design a massive project located in Neighborhood 2 of Shenzhen’s Qianhai district. The project covers 6.18 hectares and includes five commercial towers totaling 450,000 square meters—the firm’s largest project to-date in China.

The overall development totals 503,000 square meters and includes three office towers, a five-star hotel tower, an apartment tower, shopping mall, and retail stores. Goettsch is designing all of the towers, as well as the hotel and apartment podiums and their affiliated program spaces. UK-based design firm Benoy is developing the master plan and designing the shopping mall and retail areas.

The Qianhai district is a special economic zone designated for an ambitious $45 billion overall development to transform the 15-square-kilometer area into the “Manhattan of the Pearl River Delta.” Neighborhood 2 is the most recent of three Qianhai parcels sold.

The overall design concept is one of a unified complex composed of buildings with related yet individual exterior characteristics and facades designed with a textured elegance that differentiates them from the surrounding blue-glass buildings of Shenzhen.

A metallic-painted aluminum frame with consistent spacing between verticals prioritizes internal planning flexibility for the office towers. The spacing between horizontal frame elements varies from a two-story to a four-story rhythm in order to respond more individually to each office building’s height and proportions.

The frame’s vertical component is accentuated by means of double fins; this character is countered by an expression of double horizontal fins on the hotel and apartment towers that create a related yet different appearance while affording maximum flexibility for views and natural ventilation.

“We are delighted and honored to win this prestigious commission,” said James Zheng, AIA, LEED AP, President of Goettsch Partners. “We are confident  to design a modern, bold and highly sustainable world class complex for the new Qianhai district.”

The commission marks Goettsch Partner’s latest project for China Resources Land. Other assignments include the Grand Hyatt Dalian, an over 400-meter-tall mixed-use tower in Nanning, the Hotel Kapok Shenzhen Bay, and two additional towers at Shenzhen Bay.

 

Related Stories

| Jul 21, 2014

Designing the process of leadership transition

Transition planning can be one of the more complex challenges that firms face. Effective plans begin by determining the gap between a firm’s current state and the future it envisions for itself. SPONSORED CONTENT

| Jul 21, 2014

16 utility questions to answer during your building project

We need electricity to power our building projects, along with water and gas and a faultless sanitation system. That’s what we think about when we think about utility requirements for our building project, but are we missing something? SPONSORED CONTENT

| Jul 21, 2014

Commercial real estate development growing at strongest pace since recovery began: NAIOP report

Industrial, warehousing, office, and retail sectors see strong gains; Texas leads the nation in construction-value stats.

| Jul 21, 2014

Economists ponder uneven recovery, weigh benefits of big infrastructure [2014 Giants 300 Report]

According to expert forecasters, multifamily projects, the Panama Canal expansion, and the petroleum industry’s “shale gale” could be saving graces for commercial AEC firms seeking growth opportunities in an economy that’s provided its share of recent disappointments.

| Jul 21, 2014

Workplace trends survey reveals generational patterns in office use

Data analysis from Mancini•Duffy indicates significant variations among age cohorts in the workplace.

| Jul 20, 2014

IPD contract saves time and money for cancer center [2014 Building Team Awards]

Partners share the risk and reward of extreme collaboration on this LEED Silver project, which relies heavily on Lean principles.

| Jul 20, 2014

Why every major U.S. city should be nurturing ‘Innovation Hubs’

Today, more than ever, tech districts are the key to economic growth for metro markets. A new report from the Brookings Institution calls tech hubs the superchargers of innovation economies and creators of highly coveted tech jobs.

| Jul 18, 2014

Contractors warm up to new technologies, invent new management schemes [2014 Giants 300 Report]

“UAV.” “LATISTA.” “CMST.” If BD+C Giants 300 contractors have anything to say about it, these new terms may someday be as well known as “BIM” or “LEED.” Here’s a sampling of what Giant GCs and CMs are doing by way of technological and managerial innovation.

| Jul 18, 2014

Top Construction Management Firms [2014 Giants 300 Report]

Jacobs, Barton Malow, Hill International top Building Design+Construction's 2014 ranking of the largest construction management and project management firms in the United States. 

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021