flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Goettsch Partners’ and Lead8’s mixed-use complex begins construction in Changchun, China

Mixed-Use

Goettsch Partners’ and Lead8’s mixed-use complex begins construction in Changchun, China

The complex includes a 980-foot tower.


By David Malone, Associate Editor | January 2, 2019
Changchun CR Center designed by Goettsch Partners

Courtesy Goettsch Partners.

Changchun CR Center, mixed-use complex spread across an eight-acre parcel in Changchun China, will comprise multiple towers that include office space, high-end residential units, and fully furnished serviced apartments. Goettsch partners is designing the main tower while Lead8 is designing the center’s retail and entertainment center.

The development’s tallest tower is a 980-foot skyscraper that will feature a 66th-floor observation deck in its illuminated crown that overlooks the adjacent Mudan Yuan park and lake. CR Land will occupy a 63-story, 1.5-million-sf office tower that includes direct connection to the subway.

 

See Also: Bangkok’s latest mega shopping mall features one of the world’s longest pillarless all-glass facade

 

At the main tower’s base is the MixC RDE Center, Lead8’s concept for China’s popular MixC brand. The retail and entertainment complex features an integrated retail street with luxury brand stores, pop-up exhibitions, and fine-dining functions year-round. A glass façade establishes a visual connection with the street to enhance the MixC RDE Center’s impact on Changchun’s surrounding urban life.

The Changchun CR Center is slated to open in 2021. It is the third major collaboration for Goettsch Partners, Lead8, and developer China Resources Land.

 

Changchun CR Center in Changchun ChinaCourtesy Goettsch Partners.

Tags

Related Stories

| Jun 4, 2013

SOM research project examines viability of timber-framed skyscraper

In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.

| Apr 30, 2013

First look: North America's tallest wooden building

The Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely availablearound the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.

| Mar 3, 2013

Hines acquires Archstone's interest in $700 million CityCenterDC project

The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021