flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GLY Construction to build underground, robotic parking garage for Seattle Cancer Care Alliance

Transportation & Parking Facilities

GLY Construction to build underground, robotic parking garage for Seattle Cancer Care Alliance

The project is being built beneath an upcoming addition to the clinic.


By David Malone, Associate Editor | February 7, 2020
WÖHR Multiparker 730 system

Photo: WÖHR

A three-level, robotic parking garage will be built underneath an upcoming addition to the ZGF Architects-designed Seattle Cancer Care Alliance (SCCA) clinic in Seattle’s South Lake Union neighborhood. GLY has partnered with WÖHR and subcontractor Harding Steel to build the WÖHR Multiparker 730 system.

The garage, which will solve space challenges and improve the experience for cancer patients and their families, will be the first of its kind for any medical center in the Puget Sound Region and the first of its size and scale on the West Coast. It will be built under a long, narrow 240,000-sf, five-story complex also being constructed by GLY.

 

See Also: Power moves: The Shed

 

Patients will be able to drop their vehicle off at a centralized valet who then will take the cars to one of the garage’s robotic lifts and platforms that shift cars vertically and horizontally until they reach a designated spot. The system will be able to park cars closer together than traditional parking spaces, with about 160-180 spots in total. It will also reduce the time and hassle of patients getting in and out of small, ramp-filled garages.

The garage is being designed to be flexible for future use, as it can be disassembled and reshaped for different uses to accommodate needs for future services.

Related Stories

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| Apr 23, 2012

Thornton Tomasetti project wins AISC Merit Award

Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.

| Feb 15, 2012

Skanska secures $87M contract for subway project

The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.

| Feb 10, 2012

LAX Central Utility Plant project tops out

Construction workers placed the final structural steel beam atop the Plant, which was designed with strict seismic criteria to help protect the facility and airport utilities during an earthquake.

| Dec 19, 2011

Davis Construction breaks ground on new NIAID property

The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each. 

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




Giants 400

Top 45 Parking Structure Engineering Firms for 2023

Walker Consultants, Kimley-Horn, Wiss, Janney, Elstner Associates, KPFF Consulting Engineers, and Walter P Moore head BD+C's ranking of the nation's largest parking structure engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report.  

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021