flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GLY Construction to build underground, robotic parking garage for Seattle Cancer Care Alliance

Transportation & Parking Facilities

GLY Construction to build underground, robotic parking garage for Seattle Cancer Care Alliance

The project is being built beneath an upcoming addition to the clinic.


By David Malone, Associate Editor | February 7, 2020
WÖHR Multiparker 730 system

Photo: WÖHR

A three-level, robotic parking garage will be built underneath an upcoming addition to the ZGF Architects-designed Seattle Cancer Care Alliance (SCCA) clinic in Seattle’s South Lake Union neighborhood. GLY has partnered with WÖHR and subcontractor Harding Steel to build the WÖHR Multiparker 730 system.

The garage, which will solve space challenges and improve the experience for cancer patients and their families, will be the first of its kind for any medical center in the Puget Sound Region and the first of its size and scale on the West Coast. It will be built under a long, narrow 240,000-sf, five-story complex also being constructed by GLY.

 

See Also: Power moves: The Shed

 

Patients will be able to drop their vehicle off at a centralized valet who then will take the cars to one of the garage’s robotic lifts and platforms that shift cars vertically and horizontally until they reach a designated spot. The system will be able to park cars closer together than traditional parking spaces, with about 160-180 spots in total. It will also reduce the time and hassle of patients getting in and out of small, ramp-filled garages.

The garage is being designed to be flexible for future use, as it can be disassembled and reshaped for different uses to accommodate needs for future services.

Related Stories

| Dec 17, 2013

Kahn appoints Alan Cobb President and CEO

Cobb is the tenth president in the firm’s 118-year history. As President, Cobb is responsible for ensuring that all of the firm’s client issues are effectively address and that overall project team performance meets or exceeds client expectations for each and job the firm undertakes.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Nov 27, 2013

Exclusive survey: Revenues increased at nearly half of AEC firms in 2013

Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Nov 6, 2013

Energy-efficiency measures paying off for commercial building owners, says BOMA study

The commercial real estate industry’s ongoing focus on energy efficiency has resulted in a downward trend in total operating expenses (3.9 percent drop, on average), according to BOMA's Experience Exchange Report.

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




Giants 400

Top 45 Parking Structure Engineering Firms for 2023

Walker Consultants, Kimley-Horn, Wiss, Janney, Elstner Associates, KPFF Consulting Engineers, and Walter P Moore head BD+C's ranking of the nation's largest parking structure engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report.  

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021