flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.


By Posted by Tim Gregorski, Senior Editor | May 24, 2012
Construction spending still shows inconsistent performance but over the last yea
Construction spending still shows inconsistent performance but over the last year the trend has clearly been increased spending.

Gilbane Building Company announced the publication of the Spring 2012 edition of Construction Economics – Market Conditions in Construction. Based on an array of economic data, construction starts, and material cost trends, this free report projects expanding work volume, slowly increasing workforce and material price increases are leading to a growing escalation rate. Nevertheless, some critical indicators are illustrating a positive trend.

According to the report, the ABI, which predicts activity 9-12 months out, indicated a slight downturn that the industry is currently experiencing. Since July 2011, all indices have been climbing, which bodes well for newly anticipated work growth in the second and third quarters of 2012. Construction spending still shows inconsistent performance but over the last year the trend has clearly been increased spending.

Among the topics covered in this comprehensive report are:

  • Construction Starts, Spending, & Costs
  • Material Price Movement
  • Trends and Costs for Structural Steel, Recycling Steel, & Copper
  • Architectural Billings Index
  • Current Inflation Forecast

This free report is available for download, at http://www.gilbaneco.com/construction-economics or by clicking here. +

Related Stories

Mixed-Use | Mar 13, 2015

Dubai announces mega waterfront development Aladdin City

Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.

Contractors | Mar 13, 2015

Construction materials prices rise for first time in six months

The largest monthly gain in petroleum prices in over three years caused construction materials prices to expand 0.4% in February, ending a six-month streak when prices failed to rise, according to the Bureau of Labor Statistics.

High-rise Construction | Mar 12, 2015

Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul

If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia.

High-rise Construction | Mar 12, 2015

Foster and Partners designs 'The One' in Toronto

Developer Sam Mizrahi worked with Foster and Partners and Core Architects to design Toronto's tallest skyscraper aside from the CN Tower, The One, which will house a luxury shopping mall and condos.

Contractors | Mar 12, 2015

Construction demand exploding in 2015, but costs complicate recovery

Raw materials and labor costs temper expectations for soaring profits.

Codes and Standards | Mar 12, 2015

Energy Trust of Oregon offers financial incentives for net-zero buildings

The organization is offering technical assistance along with financial benefits.

BIM and Information Technology | Mar 11, 2015

Google plans to use robots, cranes to manipulate modular offices at its new HQ

Its visions of “crabots” accentuate the search-engine giant’s recent fascination with robotics and automation.

Sports and Recreational Facilities | Mar 11, 2015

Foster + Partners wins bid for 2022 World Cup centerpiece stadium in Qatar

Norman Foster described the design as “an exciting step forward in stadium design—it will be the first to break the mold of the free-standing suburban concept, and instead anticipates the grid of this future city.” 

Architects | Mar 10, 2015

German architect Frei Otto named 2015 Pritzker Architecture Prize laureate

The news comes a day after the visionary architect, 89, died in his native Germany.

Modular Building | Mar 10, 2015

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021