flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gilbane to manage retrofit of the Fraunhofer CSE R&B structure

Gilbane to manage retrofit of the Fraunhofer CSE R&B structure

Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.


By By BD+C Staff | April 30, 2012
The Center will serve as the Fraunhofers new headquarters, housing advanced res
The Center will serve as the Fraunhofers new headquarters, housing advanced research labs and staff.

The new Fraunhofer Center for Sustainable Energy Systems, with construction managed by Gilbane Building Co., involves a retrofit that will transform the historic, 100-year-old building at 5 Channel Center in Boston into a building technology showcase for clean energy technologies and research.

The Center will serve as the Fraunhofer’s new headquarters, housing advanced research labs and staff. In addition to pre-construction and construction management services for the renovation of the building’s core and shell, Gilbane will provide Fraunhofer with specialized knowledge and expertise related to the construction of energy efficient buildings.

Fraunhofer is also using $2.7 million in energy efficient building products donated by nearly 40 companies, ranging from building material manufacturing giants like Dow Corning Corp. to Massachusetts start-up companies. CSE researchers will evaluate the reliability and effectiveness of the technologies incorporated into the building, helping technology developers prove out their products with building-integrated and other applied research.

The facility is being designed by DiMella Shaffer with BR+A as engineers. Renovations will begin in July and are scheduled to be complete by the end of this year. The Center will target LEED Platinum.

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021