flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gilbane to manage retrofit of the Fraunhofer CSE R&B structure

Gilbane to manage retrofit of the Fraunhofer CSE R&B structure

Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.


By By BD+C Staff | April 30, 2012
The Center will serve as the Fraunhofers new headquarters, housing advanced res
The Center will serve as the Fraunhofers new headquarters, housing advanced research labs and staff.

The new Fraunhofer Center for Sustainable Energy Systems, with construction managed by Gilbane Building Co., involves a retrofit that will transform the historic, 100-year-old building at 5 Channel Center in Boston into a building technology showcase for clean energy technologies and research.

The Center will serve as the Fraunhofer’s new headquarters, housing advanced research labs and staff. In addition to pre-construction and construction management services for the renovation of the building’s core and shell, Gilbane will provide Fraunhofer with specialized knowledge and expertise related to the construction of energy efficient buildings.

Fraunhofer is also using $2.7 million in energy efficient building products donated by nearly 40 companies, ranging from building material manufacturing giants like Dow Corning Corp. to Massachusetts start-up companies. CSE researchers will evaluate the reliability and effectiveness of the technologies incorporated into the building, helping technology developers prove out their products with building-integrated and other applied research.

The facility is being designed by DiMella Shaffer with BR+A as engineers. Renovations will begin in July and are scheduled to be complete by the end of this year. The Center will target LEED Platinum.

Related Stories

| May 29, 2013

Realtors report positive trends in commercial real estate market

Realtors who practice commercial real estate have reported an increase in annual gross income for the third year in a row, signaling the market is on the road to recovery.

| May 29, 2013

6 award-winning library projects

The Anacostia Neighborhood Library in Washington, D.C., and the renovation of Cass Gilbert’s grand Beaux-Arts library in St. Louis are among six projects to be named 2013 AIA/ALA Library Building Award winners.

| May 28, 2013

LED lighting's risks and rewards

LED lighting technology provides unique advantages, but it’s also important to understand its limitations for optimized application.

| May 28, 2013

Minneapolis transit hub will double as cultural center [slideshow]

The Building Team for the Interchange project in downtown Minneapolis is employing the principles of "open transit" design to create a station that is one part transit, one part cultural icon.

| May 24, 2013

James Turrell's art installation turns Guggenheim Museum into 'skyspace'

James Turrell, an artist whose projects are more properly defined as "light sculptures," will have a major installation at the Guggenheim Museum this summer, turning Frank Lloyd Wright's famed serpentine atrium into a show of shifting colors and textures. The site-specific project, Aten Reign, will run from June 21 to September 25.

| May 24, 2013

First look: Revised plan for Amazon's Seattle HQ and 'biodome'

NBBJ has released renderings of a revised plan for Amazon's new three-block headquarters in Seattle. The proposal would replace a previously approved six-story office building with a three-unit "biodome."

| May 23, 2013

Supertall 'Sky City' will house 4,400 families in Changsha, China

Broad Sustainable Building has completed a long and arduous approval process, and is starting excavation and construction on Sky City in June, 2013. The proposed "world's tallest building" will be a mixed-use project that could accommodate life and work needs of up to 30,000 people.

| May 23, 2013

Are design-build contracts killing small architecture firms?

Are federal design-build contract laws unfair to small firms? AIA thinks so, citing an interesting fact: an architecture firm spends a median of $260,000 to compete for a design-build project.

| May 23, 2013

Is the 'bring your own device' discussion stumping your IT group?

A new twist to the communication challenge most companies and IT departments face is the “bring your own device,” or BYOD, conundrum. I call it a conundrum because it is stumping many IT professionals.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021