To mark the 25th anniversary of the Berlin Wall’s fall, LED-lit balloons will line the wall’s former span, between Oberbaumbrücke and Bornholm Road, The Creators Project reports.
The balloons will be up for two days and two nights, starting November 7.
The project, named Lichtgrenze (or Border of Light), makes for a colossal art installation that will span 10 miles, dividing Berlin back to East and West. There will be 8,000 LED light-filled balloons, each 11 feet high and with 24-inch-diameter orbs, lining the path.
Researchers at the University of Hannover were asked to help design the balloons to be biodegradable. The material will decompose by natural environment factors such as sunlight, oxygen, and bacteria.
The idea for the installation was conceived by light artist and designer Christopher Bauder and his brother, filmmaker Marc Bauder.
Along key locations of the trail will be 30-foot-tall video screens that will play historical footage of the Wall, which Marc Bauder plans to use to juxtapose divided Berlin with the city today.
On the last day, November 9, at 7 pm—the anniversary of the fall of the Wall—patrons can attach personal notes to the balloons and then discconect them, allowing the helium-filled orbs to float into the Berlin night sky. LEDs integrated into the stands, powered by 60,000 batteries, will illuminate the orbs as they take off.
Stay tuned for more updates of the event at The Creators Project.
Related Stories
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.