To mark the 25th anniversary of the Berlin Wall’s fall, LED-lit balloons will line the wall’s former span, between Oberbaumbrücke and Bornholm Road, The Creators Project reports.
The balloons will be up for two days and two nights, starting November 7.
The project, named Lichtgrenze (or Border of Light), makes for a colossal art installation that will span 10 miles, dividing Berlin back to East and West. There will be 8,000 LED light-filled balloons, each 11 feet high and with 24-inch-diameter orbs, lining the path.
Researchers at the University of Hannover were asked to help design the balloons to be biodegradable. The material will decompose by natural environment factors such as sunlight, oxygen, and bacteria.
The idea for the installation was conceived by light artist and designer Christopher Bauder and his brother, filmmaker Marc Bauder.
Along key locations of the trail will be 30-foot-tall video screens that will play historical footage of the Wall, which Marc Bauder plans to use to juxtapose divided Berlin with the city today.
On the last day, November 9, at 7 pm—the anniversary of the fall of the Wall—patrons can attach personal notes to the balloons and then discconect them, allowing the helium-filled orbs to float into the Berlin night sky. LEDs integrated into the stands, powered by 60,000 batteries, will illuminate the orbs as they take off.
Stay tuned for more updates of the event at The Creators Project.
Related Stories
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.
| Feb 29, 2012
Carvalho appointed Shawmut Safety Director
He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system.
| Feb 29, 2012
Shepley Bulfinch selected to design new Children’s Hospital of Buffalo
The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.