To mark the 25th anniversary of the Berlin Wall’s fall, LED-lit balloons will line the wall’s former span, between Oberbaumbrücke and Bornholm Road, The Creators Project reports.
The balloons will be up for two days and two nights, starting November 7.
The project, named Lichtgrenze (or Border of Light), makes for a colossal art installation that will span 10 miles, dividing Berlin back to East and West. There will be 8,000 LED light-filled balloons, each 11 feet high and with 24-inch-diameter orbs, lining the path.
Researchers at the University of Hannover were asked to help design the balloons to be biodegradable. The material will decompose by natural environment factors such as sunlight, oxygen, and bacteria.
The idea for the installation was conceived by light artist and designer Christopher Bauder and his brother, filmmaker Marc Bauder.
Along key locations of the trail will be 30-foot-tall video screens that will play historical footage of the Wall, which Marc Bauder plans to use to juxtapose divided Berlin with the city today.
On the last day, November 9, at 7 pm—the anniversary of the fall of the Wall—patrons can attach personal notes to the balloons and then discconect them, allowing the helium-filled orbs to float into the Berlin night sky. LEDs integrated into the stands, powered by 60,000 batteries, will illuminate the orbs as they take off.
Stay tuned for more updates of the event at The Creators Project.
Related Stories
| May 1, 2012
Gilbane to build $100 million cranberries manufacturing facility
Gilbane to provide design build services for a new Lean manufacturing facility for Ocean Spray Cranberries Inc., beverage products.
| May 1, 2012
Construction is underway on MLK ambulatory care center in L.A.
Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.
| Apr 30, 2012
Virginia Commonwealth unveils design for Arts Institution
Institute for Contemporary Art will serve as a catalyst for exhibitions, programs, research and collaboration.
| Apr 30, 2012
Summit Design + Build completes build-out for Office Concepts
The project is seeking LEED ID Silver certification from the U.S. Green Building Council.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 30, 2012
Gilbane to manage retrofit of the Fraunhofer CSE R&B structure
Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.
| Apr 30, 2012
KBE Building completes renovation at the ConnCAT
The $1.2 million project consisted of a 16,000-sf interior renovation.
| Apr 27, 2012
GreenExpo365.com to offer webinars on EPA’s WaterSense Program
Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.
| Apr 27, 2012
APA launches wood design web portal for building and design pros
Design professionals who are members of APA’s Professional Associates are automatically enrolled in the APA Designers Circle program.