flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

German healthcare design specialist TMK Architekten joins HDR Architecture

German healthcare design specialist TMK Architekten joins HDR Architecture

Merged company will conduct business as HDR TMK


By HDR Architecture | March 4, 2013
German healthcare design specialist TMK Architekten joins HDR Architecture
German healthcare design specialist TMK Architekten joins HDR Architecture

TMK Architekten • Ingenieure, one of Germany’s leading healthcare architecture firms, announced today that it is joining forces with HDR Architecture, the world’s No. 1 healthcare and science + technology design firm. The merged company will conduct business as HDR TMK, and will be the hub for the firm’s healthcare and science + technology design programs in Europe.

TMK joins the HDR family with nearly 200 employees located in offices in Berlin, Dortmund, Düsseldorf, Erfurt, Kiel, and Leipzig, Germany. Since its foundation more than 50 years ago, the firm has designed more than 1,500 healthcare projects throughout Europe, ranging from large-scale replacement hospitals to community clinics, surgical centers and outpatient facilities. The firm is well-known as an innovator in designing contemporary buildings for health—buildings that are distinctively designed to focus on people and to aid in the healing process.

“This is an exciting announcement for both HDR and TMK and a key part of our global strategy,” says Doug Wignall, president of HDR Architecture. “As a firm, HDR has made a commitment not only to designing projects all over the world and bringing the best ideas from around the globe to our clients, but to establishing a permanent presence in strategic locations around the globe.  We are excited about the opportunity to blend the unique perspective that TMK offers as a German healthcare practice into HDR’s global team of thought leaders from North America, the Middle East and the Pacific Rim.”

Reflecting on the merger of the practices, Guido Messthaler, a Senior Partner with TMK Architekten, notes that, “Both firms are compatible on many levels, specifically in our commitment to our clients and to design excellence.” He continues, “The merger will deepen our healthcare expertise and enable us to reach deeper in the European marketplace. And with access to HDR’s expertise and portfolio, we will also be able to further develop work in the science and technology and higher education markets.”

HDR Architecture employs more than 1,300 professionals in 44 offices worldwide, including offices in the U.S., Canada, China, Europe, the Middle East and Australia. Global acquisitions are a key part of the firm’s growth strategy; with the addition of TMK, over 20% of HDR Architecture’s employees are located outside of the United States.

About HDR Architecture
HDR Architecture is a part of the HDR, Inc. family, a global architecture, engineering and consulting firm with more than 8,000 professionals in 190 locations worldwide. The architecture practice is an industry leader in designing technologically complex buildings and infrastructure; it is ranked as the No. 1 healthcare and science + technology design firm in the “World Architecture 100” ranking. Recent projects in Europe include the new Roslin Institute Building at the University of Edinburgh in Midlothian, Scotland; the Iberian Nanotechnology Laboratory in Braga, Portugal; and multiple projects for the Pirbright Institute in Surrey, United Kingdom. In addition to the newly acquired TMK offices in Germany, HDR has a design studio in London, UK.  Visit www.hdrinc.com and www.tmk-architekten.de/

Related Stories

| Jun 20, 2013

Virtual meetings enhance design of University at Buffalo Medical School

HOK designers in New York, St. Louis and Atlanta are using virtual meetings with their University at Buffalo (UB) client team to improve the design process for UB’s new School of Medicine and Biomedical Sciences on the Buffalo Niagara Medical Campus.

| Jun 19, 2013

Architects upbeat about the construction market

Following the first reversal into negative territory in ten months in April, AIA's Architecture Billings Index bounced back in May, reaching 52.9.

| Jun 19, 2013

NSF Sustainability begins verifying EPDs that can be used for LEED V4

NSF Sustainability has verified Environmental Product Declarations (EPDs) for nylon carpet styles and colors manufactured by Mannington Commercial and for J+J Flooring Group’s Kinetex® flooring product and Invision brand modular styles that use eKo® backing.  

| Jun 19, 2013

Florida is latest battleground over LEED standards centered on certified wood

A nationwide battle over forest certification standards continues to be played out nationally and in Florida with legislation passed this month. 

| Jun 19, 2013

Construction site safety improved in 2011

On-the-job construction fatalities dropped from 802 in 2010 to 781 in 2011, and recordable injuries fell from 4.7 per 100 workers in 2008 to 3.9 per 100 in 2011, according to data from the Bureau of Labor Statistics. 

| Jun 19, 2013

New York City considers new construction standards for hospitals, multifamily buildings

Mayor Michael Bloomberg’s administration has proposed new building codes for hospitals and multifamily dwellings in New York City to help them be more resilient in the event of severe weather resulting from climate change.  

| Jun 18, 2013

Report: HVAC occupancy sensors could slash building energy demand by 18%

Researchers at the DOE's Pacific Northwest National Laboratory conclude that significant energy savings can be achieved by varying ventilation levels based on the number of people in a given space.

| Jun 18, 2013

Turner report: Activity in urban markets driving construction cost increases

Turner Construction Company announced that the Second Quarter 2013 Turner Building Cost Index – which measures costs in the non-residential building construction market in the United States – has increased to a value of 859. This reflects a 1.18% increase from the First Quarter 2013 and 4.00% yearly increase from the Second Quarter 2012.

| Jun 17, 2013

First look: Austin to get first high-rise since 2003

Developer Cousins Properties broke ground on the 29-story Colorado Tower in downtown Austin, Texas, the city's first high-rise building since Cousins' completed the Frost Bank Tower a decade ago.

| Jun 17, 2013

DOE launches database on energy performance of 60,000 buildings

The Energy Department today launched a new Buildings Performance Database, the largest free, publicly available database of residential and commercial building energy performance information.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021