flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Georgia-Pacific pushes forward on construction of newest industrial building in Tennessee  

Industrial Facilities

Georgia-Pacific pushes forward on construction of newest industrial building in Tennessee  

The 900,000-sf manufacturing/warehousing facility will support the company’s disposable tableware brands when it opens next year.
 


By John Caulfield, Senior Editor | September 6, 2023
A rendering of Georgia-Pacific's Dixie plant in Jackson, Tenn., which is scheduled to open next year. Images; Courtesy of jE Dunn
A rendering of G-P's newest plant in Tennessee, where it already operates six other facilities. Images: Courtesy of JE Dunn

Georgia-Pacific’s $425 million manufacturing plant, which is under construction in Jackson, Tenn., about 70 miles east of Memphis, is the largest single investment in Jackson’s history.
 
This 900,000-sf air-conditioned industrial facility, which is scheduled for completion in the summer of 2024, will span across 241 acres. When it opens, it will produce Dixie-branded disposable tableware such as plates and bowls. It will also support G-P’s Livingware and GP Pro business segments.
 
This project represents one of the most advanced industrial facilities that its general contractor, JE Dunn Construction, has ever built, according to the GC’s Vice President and Project Executive Eric Magsamen. “You will find modern technologies that are all connected and work harmonious[ly] … to bring new levels of efficiency and ease to day-to-day operations,” he said in a prepared statement.
 
The plant—for which G-P broke ground in September 2022—will feature printer equipment, associated plate-forming converting assets, advanced automation technology, and connected control systems. The facility will include manufacturing, warehousing, rail dock areas, and maintenance shops. There will also be a separate 16,000-sf office space.

 

Industrial building will create 220 new jobs

 

The building team topped off G-P's new manufacturing plant in Tennessee last month.


 
The Building Team includes design architect Randall-Paulson Architects, and structural engineer Bennett & Pless. For this greenfield project, JE Dunn excavated 390,000 yards of dirt and poured 52,000 cubic yards of concrete. JE Dunn also designed and engineered a 22,000-ft wastewater pre-treatment system with nearly a half-mile of underground plumbing, and an IT and electrical infrastructure that uses 58,000 ft of conduit, totaling more than 110 miles of cable.
 
Georgia-Pacific’s plant, its first new Dixie facility since 1991, will create more than 220 jobs in the region when it’s fully operational. (Currently, G-P directly employs about 460 people and 1,430 indirectly, and operates six facilities in Tennessee whose economic impact has translated to a $250 million capital investment since 2011.)

Related Stories

Giants 400 | Sep 9, 2019

2019 Industrial Sector Giants Report: Managing last mile delivery

This and more industrial building sector trends from Building Design+Construction's 2019 Giants 300 Report. 

Industrial Facilities | Mar 10, 2019

The burgeoning Port San Antonio lays out growth plans

Expansions would accommodate cybersecurity, aerospace, and defense tenants, and help commercialize technologies.

Industrial Facilities | Feb 28, 2019

*UPDATED WITH IMAGES* Rooftop park and ski slope on Amager Bakke waste-to-energy plant set to open in April

The park is designed to act as a ‘green bomb’ for the surrounding area.

Industrial Facilities | Oct 25, 2018

Pilot training center completes in Arlington, Texas

Merriman Anderson/Architects was the architect for the project.

Building Automation | Jul 13, 2018

Katerra has plans for a new advanced manufacturing factory in California

The building components facility will be located near rail, shipping ports, and freeways.

Industrial Facilities | Jul 11, 2018

AEC firms tap into the boom in logistics center construction

A Ryan Companies project in southern California is being built to meet its city’s rigorous green standards.

Industrial Facilities | Jun 27, 2018

Hawaii announces completion of $375 million wastewater project

The new sewer tunnel and pump station help enhance Oahu’s utility infrastructure.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


Industrial Facilities

8 ways to cool a factory

Whichever way you look at it—from a workplace wellness point of view or from a competing for talent angle—there are good reasons to explore options for climate control in the factory workplace.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021