flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gensler & J.C. Anderson team for pro bono high school project in Chicago

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.


By Posted by Tim Gregorski, Senior Editor | May 8, 2012
The City Year transformation took place within the short time frame of one week
The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile ca

Gensler and J.C. Anderson, Inc. announced the completion of a new office and classroom space on behalf of City Year at Orr Academy High School on Chicago’s West Side.

City Year is an education focused, nonprofit organization that unites young people of all backgrounds for a year of full-time service to keep students in school and on track to graduation. City Year operates in 20 U.S. locations and with two international affiliates including Chicago. As tutors and mentors, City Year Chicago corps members provide critically needed services to some of Chicago’s most underserved youth.

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members. Gensler embraced the opportunity and then enlisted J.C. Anderson, Inc. to contribute their construction expertise.

The project began with Visioning Sessions hosted by Gensler during which the Orr High School students were asked to contribute their visions for the new space, particularly as they related to learning, hanging-out and celebrating. The students then broke-out into groups and prepared visual presentations to share their ideas. Gensler’s initial concept for a “College Parlor” themed space stemmed directly from the students’ posters and presentations.

The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile carpeting, ancillary furniture (including lounge pieces, desks, chairs, benches, team tables and coffee tables) a custom 40’-0” long writable millwork mdf marker board with a student designed wall mural at one end and custom graphic film patterns for three existing storefront walls. Volunteers from Gensler, J.C. Anderson, Inc., City Year and the school were on hand to assist with the implementation of the design.

Susan Harrington led the architectural and design team on behalf of Gensler and Tom Raveret assembled the team from J.C. Anderson, Inc. Both Gensler and J.C. Anderson, Inc. provided services at no charge to City Year. +

Related Stories

| Aug 11, 2010

Report: Building codes and regulations impede progress toward uber-green buildings

The enthusiasm for super green Living Buildings continues unabated, but a key stumbling block to the growth of this highest level of green building performance is an existing set of codes and regulations. A new report by the Cascadia Region Green Building Council entitled "Code, Regulatory and Systemic Barriers Affecting Living Building Projects" presents a case for fundamental reassessment of building codes.

| Aug 11, 2010

Call for entries: Building enclosure design awards

The Boston Society of Architects and the Boston chapter of the Building Enclosure Council (BEC-Boston) have announced a High Performance Building award that will assess building enclosure innovation through the demonstrated design, construction, and operation of the building enclosure.

| Aug 11, 2010

Portland Cement Association offers blast resistant design guide for reinforced concrete structures

Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads.  It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.

| Aug 11, 2010

ACSA announces 2008-2009 ACSA/AISC steel design student competition winners

The Association of Collegiate Schools of Architecture (ACSA) is pleased to announce the winners of the ninth annual steel design student competition for the 2008-2009 academic year.  Administered by the Association of Collegiate Schools of Architecture (ACSA) and sponsored by the American Institute of Steel Construction (AISC), the program challenged students, working individually or in teams, to explore a variety of design issues related to the use of steel in design and construction.

| Aug 11, 2010

ZweigWhite Announces 2009 Best Firms to Work For

Management consulting and research firm ZweigWhite has identified the best civil engineering, structural engineering, multidiscipline A/E services, environmental services, and architecture firms to work for in its annual ranking of top industry firms. These outstanding employers were selected based on their commitment to provide a positive work environment and challenging and interesting work opportunities for their employees.

| Aug 11, 2010

Autodesk 2010 Certification Now Available for Design Professionals

Autodesk, Inc., (Nasdaq: ADSK), today announced that design and engineering professionals can become Autodesk Certified in AutoCAD 2010, Autodesk Inventor 2010, Autodesk Revit Architecture 2010, and AutoCAD Civil 3D 2010 software. Becoming Autodesk Certified allows professionals, and companies boasting Autodesk Certified employees, to validate their industry skills and knowledge, demonstrate expertise and gain credibility.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021