flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gensler & J.C. Anderson team for pro bono high school project in Chicago

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.


By Posted by Tim Gregorski, Senior Editor | May 8, 2012
The City Year transformation took place within the short time frame of one week
The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile ca

Gensler and J.C. Anderson, Inc. announced the completion of a new office and classroom space on behalf of City Year at Orr Academy High School on Chicago’s West Side.

City Year is an education focused, nonprofit organization that unites young people of all backgrounds for a year of full-time service to keep students in school and on track to graduation. City Year operates in 20 U.S. locations and with two international affiliates including Chicago. As tutors and mentors, City Year Chicago corps members provide critically needed services to some of Chicago’s most underserved youth.

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members. Gensler embraced the opportunity and then enlisted J.C. Anderson, Inc. to contribute their construction expertise.

The project began with Visioning Sessions hosted by Gensler during which the Orr High School students were asked to contribute their visions for the new space, particularly as they related to learning, hanging-out and celebrating. The students then broke-out into groups and prepared visual presentations to share their ideas. Gensler’s initial concept for a “College Parlor” themed space stemmed directly from the students’ posters and presentations.

The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile carpeting, ancillary furniture (including lounge pieces, desks, chairs, benches, team tables and coffee tables) a custom 40’-0” long writable millwork mdf marker board with a student designed wall mural at one end and custom graphic film patterns for three existing storefront walls. Volunteers from Gensler, J.C. Anderson, Inc., City Year and the school were on hand to assist with the implementation of the design.

Susan Harrington led the architectural and design team on behalf of Gensler and Tom Raveret assembled the team from J.C. Anderson, Inc. Both Gensler and J.C. Anderson, Inc. provided services at no charge to City Year. +

Related Stories

| Dec 19, 2011

Summit Design+Build selected as GC for Chicago recon project

The 130,000 square foot building is being completely renovated.

| Dec 19, 2011

USGBC welcomes new board directors?

Board responsible for articulating and upholding the vision, values, mission of organization.

| Dec 19, 2011

Davis Construction breaks ground on new NIAID property

The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each. 

| Dec 19, 2011

Survey: Job growth driving demand for office and industrial real estate in Southern California

Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.

| Dec 16, 2011

Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University

The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration. 

| Dec 16, 2011

Stalco Construction converts Babylon, N.Y. Town Hall into history museum

The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.

| Dec 14, 2011

Belfer Research Building tops out in New York

Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.

| Dec 14, 2011

Tyler Junior College and Sika Sarnafil team up to save energy

Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.

| Dec 13, 2011

Lutron’s Commercial Experience Center awarded LEED Gold

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021