flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gensler & J.C. Anderson team for pro bono high school project in Chicago

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.


By Posted by Tim Gregorski, Senior Editor | May 8, 2012
The City Year transformation took place within the short time frame of one week
The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile ca

Gensler and J.C. Anderson, Inc. announced the completion of a new office and classroom space on behalf of City Year at Orr Academy High School on Chicago’s West Side.

City Year is an education focused, nonprofit organization that unites young people of all backgrounds for a year of full-time service to keep students in school and on track to graduation. City Year operates in 20 U.S. locations and with two international affiliates including Chicago. As tutors and mentors, City Year Chicago corps members provide critically needed services to some of Chicago’s most underserved youth.

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members. Gensler embraced the opportunity and then enlisted J.C. Anderson, Inc. to contribute their construction expertise.

The project began with Visioning Sessions hosted by Gensler during which the Orr High School students were asked to contribute their visions for the new space, particularly as they related to learning, hanging-out and celebrating. The students then broke-out into groups and prepared visual presentations to share their ideas. Gensler’s initial concept for a “College Parlor” themed space stemmed directly from the students’ posters and presentations.

The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile carpeting, ancillary furniture (including lounge pieces, desks, chairs, benches, team tables and coffee tables) a custom 40’-0” long writable millwork mdf marker board with a student designed wall mural at one end and custom graphic film patterns for three existing storefront walls. Volunteers from Gensler, J.C. Anderson, Inc., City Year and the school were on hand to assist with the implementation of the design.

Susan Harrington led the architectural and design team on behalf of Gensler and Tom Raveret assembled the team from J.C. Anderson, Inc. Both Gensler and J.C. Anderson, Inc. provided services at no charge to City Year. +

Related Stories

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

| Feb 27, 2012

Consigli complete first building for Bigelow Ocean Sciences Campus

Designed by WBRC Architects Engineers in association with Perkins + Will.

| Feb 27, 2012

Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.

Intricate interior project involved construction of more than 80 offices.

| Feb 27, 2012

Research Institute at Texas Children’s Hospital building receives LEED Gold

Innovative and sustainable design reflects best environmental building practices.

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

| Feb 26, 2012

Hollister Construction awarded 42,000-sf office fit-out in Holtsville, N.Y.

Space leased by U.S. General Service Administration.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021