flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gensler & J.C. Anderson team for pro bono high school project in Chicago

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.


By Posted by Tim Gregorski, Senior Editor | May 8, 2012
The City Year transformation took place within the short time frame of one week
The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile ca

Gensler and J.C. Anderson, Inc. announced the completion of a new office and classroom space on behalf of City Year at Orr Academy High School on Chicago’s West Side.

City Year is an education focused, nonprofit organization that unites young people of all backgrounds for a year of full-time service to keep students in school and on track to graduation. City Year operates in 20 U.S. locations and with two international affiliates including Chicago. As tutors and mentors, City Year Chicago corps members provide critically needed services to some of Chicago’s most underserved youth.

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members. Gensler embraced the opportunity and then enlisted J.C. Anderson, Inc. to contribute their construction expertise.

The project began with Visioning Sessions hosted by Gensler during which the Orr High School students were asked to contribute their visions for the new space, particularly as they related to learning, hanging-out and celebrating. The students then broke-out into groups and prepared visual presentations to share their ideas. Gensler’s initial concept for a “College Parlor” themed space stemmed directly from the students’ posters and presentations.

The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile carpeting, ancillary furniture (including lounge pieces, desks, chairs, benches, team tables and coffee tables) a custom 40’-0” long writable millwork mdf marker board with a student designed wall mural at one end and custom graphic film patterns for three existing storefront walls. Volunteers from Gensler, J.C. Anderson, Inc., City Year and the school were on hand to assist with the implementation of the design.

Susan Harrington led the architectural and design team on behalf of Gensler and Tom Raveret assembled the team from J.C. Anderson, Inc. Both Gensler and J.C. Anderson, Inc. provided services at no charge to City Year. +

Related Stories

| Apr 26, 2012

Blackney Hayes Architects launches new engineering division

The new division, BHH Engineers, will be led by Mark Hershman, PE.

| Apr 26, 2012

Energy efficiency requirements heighten the importance of proper protection for roofing systems

Now more than ever, a well-insulated and well protected roof is critical in new or renovated commercial buildings.

| Apr 26, 2012

Orange County, Fla. high school receives NAIOP “Public Development of the Year” award

School replacement designed by SchenkelShultz Architecture and constructed by Williams Co.

| Apr 25, 2012

Bubble skyscraper design aims to purify drinking water

The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration

| Apr 25, 2012

Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center

Project receives LEED Gold Certification.

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 25, 2012

Missner Group names McCrory VP of property management

McCrory will be responsible for overseeing the financial and operational needs of the firm’s commercial real estate portfolio which includes more than two million square feet of property.

| Apr 25, 2012

Rogers joins Morgan/Harbour as senior project manager

Rogers will also manage the construction process and daily activities as well as act as the interface between the subcontractors, owners, municipalities and regulatory agencies

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021