flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gensler & J.C. Anderson team for pro bono high school project in Chicago

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.


By Posted by Tim Gregorski, Senior Editor | May 8, 2012
The City Year transformation took place within the short time frame of one week
The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile ca

Gensler and J.C. Anderson, Inc. announced the completion of a new office and classroom space on behalf of City Year at Orr Academy High School on Chicago’s West Side.

City Year is an education focused, nonprofit organization that unites young people of all backgrounds for a year of full-time service to keep students in school and on track to graduation. City Year operates in 20 U.S. locations and with two international affiliates including Chicago. As tutors and mentors, City Year Chicago corps members provide critically needed services to some of Chicago’s most underserved youth.

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members. Gensler embraced the opportunity and then enlisted J.C. Anderson, Inc. to contribute their construction expertise.

The project began with Visioning Sessions hosted by Gensler during which the Orr High School students were asked to contribute their visions for the new space, particularly as they related to learning, hanging-out and celebrating. The students then broke-out into groups and prepared visual presentations to share their ideas. Gensler’s initial concept for a “College Parlor” themed space stemmed directly from the students’ posters and presentations.

The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile carpeting, ancillary furniture (including lounge pieces, desks, chairs, benches, team tables and coffee tables) a custom 40’-0” long writable millwork mdf marker board with a student designed wall mural at one end and custom graphic film patterns for three existing storefront walls. Volunteers from Gensler, J.C. Anderson, Inc., City Year and the school were on hand to assist with the implementation of the design.

Susan Harrington led the architectural and design team on behalf of Gensler and Tom Raveret assembled the team from J.C. Anderson, Inc. Both Gensler and J.C. Anderson, Inc. provided services at no charge to City Year. +

Related Stories

| Jan 30, 2013

Design Firm Little Expands Durham Interiors Studio

Both Benner and Byers have expertise in market sectors such as corporate, retail, hospitality, healthcare, research /technology, critical facilities, civic and education.

| Jan 22, 2013

Midwestern Construction Company Acquires Local Architecture Firm

St. Charles, Ill.-based design/build and construction firm acquires architecture firm.

| Jan 17, 2013

Thornton Tomasetti Founding Principal Thornton receives ASCE Lifetime Achievement Award

The OPAL Lifetime Achievement Award is given to civil engineers who “represent a model of achievement to which future generations of engineers aspire to match or exceed.”

| Jan 16, 2013

2013 40 Under 40 application process now open

Building Design+Construction's 40 Under 40 is open to AEC professionals from around the globe.

| Jan 16, 2013

SOM’s innovative Zhengzhou Greenland Plaza opens

The 2.59-million-square-feet building houses a mixed-use program of offices on its lower floors and a 416-room hotel.

| Jan 15, 2013

Morris Architects joins Huitt-Zollars

Morris, which will continue to provide services under its current name and leadership, is entering its 75th year of continuous practice as an architectural, interior design, landscape architecture, and planning firm.

| Jan 11, 2013

HMC Architects: In their own voices

See what HMC professionals say about their “Best AEC Firm to Work For”

| Jan 10, 2013

Guide predicts strongest, weakest AEC markets for 2013

2013 Guide to U.S. AEC markets touts apartments, natural gas, senior housing and transmission and distribution.

| Jan 9, 2013

Panasonic and Bluebeam preview new architect app at CES 2013

Panasonic and Bluebeam Software collaborate to develop and introduce the 4K tablet and software to the design and construction industry.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021