flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gensler envisions 'law firm of the future' with pop-up office project

Gensler envisions 'law firm of the future' with pop-up office project

Open floor plans, communal spaces, and standard-size offices are among the key design features. 


By BD+C Staff | May 20, 2014
Rendering: Gensler
Rendering: Gensler

Called "The Legal Office of the Future," the 5,000-sf, pop-up demonstration project designed by Genlser made its debut this week at the annual conference for the Association of Legal Administrators in Toronto, according to the Washington Post.

It is meant to combine many features that are now becoming commonplace in Washington, D.C., law firms. Some of these elements include open floor plans, plenty of communal spaces, and standard-size offices for all partners (as opposed to large corner offices for senior partners and smaller offices for more junior partners).

Gensler will guide visitors through the temporary office, pointing out why each feature was placed and why it made sense.

This project is the culmination of two years work on Gensler's part, and was accomplished in conjunction with furniture companies Herman Miller and Steelcase, and also with Microsoft and Thompson Reuters, who are providing the technology for the exhibit.

Learn more about the project at: http://www.redesign-law.com/ 

 

Related Stories

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

| May 11, 2012

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

What historic preservationists and energy-performance advocates can learn from each other.

| May 11, 2012

VFA to acquire Altus Group's Capital Planning division

Strategic move strengthens VFA's facilities capital planning market osition in North America.

| May 11, 2012

Betz promoted to senior vice president for McCarthy’s San Diego Office

He will oversee client relations, estimating, office operations and personnel as well as integration of the company’s scheduling, safety and contracts departments.

| May 11, 2012

CRSI appoints Brace chairman

Stevens also elected to board of directors and vice-chair.

| May 11, 2012

Dempster named to AIA College of Fellows

Altoon Partners’ technical and construction services leader honored for his contributions.

| May 11, 2012

AIA launches education and training portal

New portal to host Contract Documents training, education resources in one convenient place.

| May 10, 2012

Chapter 7 When Modern Becomes Historic: Preserving the Modernist Building Envelope

This AIA CES Discovery course explores the special reconstruction questions posed by Modern-era buildings.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021