As a continuation of LVMH Group’s tradition of art patronage, the Foundation Louis Vuitton is established to encourage and promote contemporary artistic creation internationally. The foundation's building is nearing completion and will be open to public on October 27 2014.
The building, a 125,000-sf glass structure designed in Frank Gehry’s signature curvaceous shape planned in the verdant 16th arrondissement, will house eleven galleries dedicated to permanent and temporary exhibitions.
In addition, a flexible auditorium will provide a platform for multi-disciplinary performances and events.
The unique location–a hectare of land in Paris’ historic park Bois de Boulogne–inspired Gehry’s glass design, which offers the foundation panoramic views of the Jardin d’Acclimatation.
Related Stories
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.