flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GE launches electric vehicle charging platform

GE launches electric vehicle charging platform

WattStation Connect provides owners a user-friendly method to manage, monitor and maintain their EV charging ecosystem network.


By By BD+C Staff | April 27, 2012
GEs WattStation pedestal EV charger is easy to use, customizable and features a
GEs WattStation pedestal EV charger is easy to use, customizable and features a retractable cord.

GE Energy’s Industrial Solutions business unveiled its new ecomagination-approved WattStation and WattStation Connect.

An electric vehicle (EV) charging station and software platform, the solution allows WattStation owners to manage charging stations remotely, giving them the ability to manage and set customer pricing for EV charging, provide access control at their facilities, generate valuable reports and engage with customers in new ways.

Now available, GE’s WattStation pedestal EV charger is easy to use, customizable and features a retractable cord.

The WattStation Connect full-service software platform helps meet a wide variety of EV needs, whether it is a retailer looking to attract new customers, a commercial property manager in need of information on electricity usage or a fleet owner in search of better cost-allocation data. WattStation Connect provides owners a user-friendly method to manage, monitor and maintain their EV charging ecosystem network.

Industrial Solutions is forming data acquisition agreements with key navigation companies to share information on the installations and availability of WattStations throughout the U.S. and Canada. This enables EV drivers to view and locate GE’s WattStations, obtain directions to the EV charging stations, access pricing details and determine whether a unit is available for charging. In addition to global positioning systems, the GE WattStation Connect data will be available through the Internet, mobile app/device and future in-vehicle systems.

GE Energy’s Industrial Solutions business is working with a well-known online payment company to enable drivers to safely and conveniently pay for charging fees through the WattStation Connect mobile app. The app will be available for download in the coming weeks. EV drivers can use the mobile app to scan the quick response (QR) barcode on the WattStation charger. The QR code will identify the station and the pricing structure for that individual charger. BD+C

Related Stories

| Aug 11, 2010

Halsey Taylor introduces 14-gauge, vandal-resistant water coolers

Adding to its extensive collection of high-quality, durable drinking fountains and water coolers, Halsey Taylor introduces the new 14 Gauge Vandal-resistant Water Cooler.  Available in both single and bi-level models (HVR8HD, HVR8HD-BL), this new water cooler line is ideal for any high-traffic application, especially those prone to tampering or misuse, such as schools, recreation centers and correctional facilities.

| Aug 11, 2010

EwingCole to merge with healthcare specialist Robert D. Lynn Associates

EwingCole, a nationally recognized architectural, engineering, interior design, and planning firm with more than 320 professionals, today announced that it will combine its practice with Robert D. Lynn Associates of Philadelphia, a 40-person firm with a robust portfolio of healthcare projects. The combination will create the Delaware Valley¹s largest and most comprehensive firm with an emphasis on healthcare architecture, and a national scope and presence.

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

See what $3,000 a month will get you at Chicago’s Aqua Tower

Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.

| Aug 11, 2010

Construction employment declines in 48 states in August compared to last year

Construction employment saw significant declines in all but two states this August compared to last year according to an analysis of new state-by-state employment figures released today by the federal government.  The analysis, conducted by the Associated General Contractors of America, however did show that the number of states gaining construction jobs increased slightly in August compared to July 2009.

| Aug 11, 2010

LEED 2009 cites FloorScore Certification as indicator of indoor air quality

The U.S. Green Building Council (USGBC) has cited FloorScore® certified flooring products as eligible for credits under the new LEED 2009 Version 3 guidelines. Reflecting the inclusion of FloorScore, the new LEED IEQ Credit 4.3 for Low-Emitting Materials has been expanded from “Carpet Systems” to “Flooring Systems” to include hard surface flooring.

| Aug 11, 2010

BIM adoption rate exceeds 80% among nation’s largest AEC firms

The nation’s largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction’s premier Top 170 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, and nearly a quarter (23%) have 100-plus seats.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021