Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his original designs for the rear section of Sagrada Família’s apse, Dezeen reports.
Slated for completion in 2017, the chapel in Chile will be the Spanish architect’s first building outside of his home country. The chapel is also expected to be completed before La Sagrada Família, one of Gaudí’s most iconic works yet to be completed.
According to Fast Company, the chapel will be named Our Lady of the Angels Chapel, and will be located in the city of Rancagua, 50 miles south of Santiago. Construction will be overseen by project architect Christian Matzner, and will cost $7 million in government funding.
The 98-foot-tall structure will be adorned with 20 oculi carved from stone in Barcelona. Lapis lazuli mined in Chile will cover the main tower, topped with a copper cross. A crypt will house the remains of friar Angélico Aranda, who wrote Gaudí a letter in 1922 asking him to design a chapel for Rancagua.
“I wish to build something original–very original–and I thought of you,” Aranda wrote in his letter, adding that he wants designs for a chapel “only as you know how to do.”
Read more on Dezeen.
Related Stories
| Aug 19, 2011
Thought Leader: Boyd R. Zoccola, chair and chief elected officer of BOMA International
Boyd R. Zoccola is Chair and Chief Elected Officer of BOMA International. A BOMA member since 1994, he has served on the Executive, Finance, Investment, and Medical/Healthcare Facilities Committees. An Indiana Real Estate Principal Broker and a board member of the Real Estate Round Table, he is Executive Vice President of Hokanson Companies, Inc., of Indianapolis, and has been involved in the development of $600 million worth of real estate. On a volunteer basis, Zoccola was president of Horizon House and a board member of Girls, Inc. He holds a BA in biology from Indiana University.
| Aug 19, 2011
How and why AEC professionals choose flooring systems
Design and construction professionals who completed our flooring survey had strong opinions about their preferred flooring type.
| Aug 19, 2011
Underfloor air distribution, how to get the details right
Our experts provide solid advice on the correct way to design and construct underfloor air distribution systems, to yield significant energy savings.
| Aug 19, 2011
Enhanced acoustical design
Ambient noise levels in some facility types are trending up and becoming a barrier to clear communication between building occupants.
| Jul 22, 2011
The Right Platform for IPD
Workstations for successful integrated project delivery, a white paper by Dell and BD+C.
| Jul 22, 2011
High-performance windows and doors
Learning objectives After reading this article, you should be able to: Understand issues of thermal performance and energy efficiency in relation to window and door systems; describe optimal detailing of the window-wall interface and how it contributes to building performance, sustainability, and occupant well-being; understand how durability contributes to sustainable windows/doors; and list sustainable O&M requirements for window and door systems.
| Jul 21, 2011
Falling Architecture Billings Index reflects decrease in design demands
This months Architecture Billings Index (ABI), provided by the American Institute of Architects, is almost a full point lower than last month’s reported score. June’s reading of 47.2 was short of the required 50 to achieve billings increases, making July’s reading of 46.3 an unwelcome sign of market tidings.
| Jun 29, 2011
New leadership role for architects in net-zero design
BD+C Editorial Director Rob Cassidy talks with RNL Design's Tom Hootman, AIA, about the changing role of architects in net-zero designs.