flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gaudi’s first work outside Spain will be a chapel in Chile

Gaudi’s first work outside Spain will be a chapel in Chile

The designs were drawn by Gaudí in the 1920s for a Chilean friar.


By BD+C Staff | January 19, 2015

Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his original designs for the rear section of Sagrada Família’s apse, Dezeen reports.

Slated for completion in 2017, the chapel in Chile will be the Spanish architect’s first building outside of his home country. The chapel is also expected to be completed before La Sagrada Família, one of Gaudí’s most iconic works yet to be completed.

According to Fast Company, the chapel will be named Our Lady of the Angels Chapel, and will be located in the city of Rancagua, 50 miles south of Santiago. Construction will be overseen by project architect Christian Matzner, and will cost $7 million in government funding.

The 98-foot-tall structure will be adorned with 20 oculi carved from stone in Barcelona. Lapis lazuli mined in Chile will cover the main tower, topped with a copper cross. A crypt will house the remains of friar Angélico Aranda, who wrote Gaudí a letter in 1922 asking him to design a chapel for Rancagua.

“I wish to build something original–very original–and I thought of you,” Aranda wrote in his letter, adding that he wants designs for a chapel “only as you know how to do.”

Read more on Dezeen.

Related Stories

| Mar 7, 2012

LEO A DALY opens new office in Riyadh, Saudi Arabia

Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.

| Mar 7, 2012

Turner appointed Batson-Cook CFO and treasurer

Cecil G. Hood to continue in advisory role.

| Mar 7, 2012

Thornton Tomasetti names Dowdall VP of Kansas City office

Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 7, 2012

Houlihan Lokey adds Steffen to Industrials Group

Steffen bolsters group with experience in the building materials and rorest product sectors.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 6, 2012

BLT Architects promotes two to associate

Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.

| Mar 6, 2012

Joliet Junior College achieves LEED Gold

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021