Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his original designs for the rear section of Sagrada Família’s apse, Dezeen reports.
Slated for completion in 2017, the chapel in Chile will be the Spanish architect’s first building outside of his home country. The chapel is also expected to be completed before La Sagrada Família, one of Gaudí’s most iconic works yet to be completed.
According to Fast Company, the chapel will be named Our Lady of the Angels Chapel, and will be located in the city of Rancagua, 50 miles south of Santiago. Construction will be overseen by project architect Christian Matzner, and will cost $7 million in government funding.
The 98-foot-tall structure will be adorned with 20 oculi carved from stone in Barcelona. Lapis lazuli mined in Chile will cover the main tower, topped with a copper cross. A crypt will house the remains of friar Angélico Aranda, who wrote Gaudí a letter in 1922 asking him to design a chapel for Rancagua.
“I wish to build something original–very original–and I thought of you,” Aranda wrote in his letter, adding that he wants designs for a chapel “only as you know how to do.”
Read more on Dezeen.
Related Stories
| Jun 29, 2012
SOM writes a new chapter at Cincinnati’s The Christ Hospital
The 332,000–sf design draws on the predominantly red brick character of The Christ Hospital’s existing buildings, interpreting it in a fresh and contemporary manner that fits well within the historic Mt. Auburn neighborhood while reflecting the institution’s dedication to experience, efficiency, flexibility, innovation and brand.
| Jun 29, 2012
Benjamin Moore Paints announces new CEO
Robert S. Merritt comes to Benjamin Moore with over three decades of management experience in the restaurant and food preparation and distribution industries
| Jun 29, 2012
Guardian launches industry’s first glass visualizer for interior design
Online tool allows designers to explore the possibilities of glass.
| Jun 28, 2012
Federal applications of renewable energy
U.S. Army Fort Knox: Using the Earth for space heating and cooling. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) facilitates the Federal Government’s implementation of sound, cost-effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.
| Jun 27, 2012
HDR opens office in Beijing
The Beijing office is HDR’s second location in China; the firm’s other office is in Shanghai.
| Jun 27, 2012
KBE Building wins honor for Armed Forces Reserve Center
The construction phase was completed in just 16 months.
| Jun 27, 2012
SOM’s Baker receives honorary doctorate in engineering from Heriot-Watt University
Baker recognized for his career and influential contribution in the field of structural engineering.
| Jun 25, 2012
Living green wall planned for InterContinental Chicago
Project, with price tag of $2 million to $3 million, needs council approval.
| Jun 25, 2012
AIA-NJ honors DMR Architects
The academic building, completed in 2009, provides classrooms, computer labs, faculty offices, and meeting spaces for the College, which has a steady 7% annual increase in enrollment.
| Jun 25, 2012
Thornton Tomasetti appoints Hofmeister and Zhu to board of directors
The addition of Hofmeister and Zhu brings the number of directors to 10.