Building castle-like ice sculptures isn’t only a thing in Disney movies anymore. Archdaily reports that a team of students from Eindhoven University is to build a 132-foot model of Antonio Gaudi’s Sagrada Familia in Juuka, Finland.
In order to achieve such heights the use of reinforced ice will be needed. A mixture of wooden fibers and plain ice will result in an ice-composite, so-called pykrete, which is three times stronger than plain ice.
According to the project team, the nave of the "Sagrada Familia in Ice" will be constructed by hanging ropes and freezing textiles. These ropes and textiles will also be a reinforcement of the ice.
The construction is planned to last a mere three weeks, a diminutive amount of time compared to the original’s 136 (and still ongoing) years!
Visit the project’s official website to learn more about this 1:4 scale ice model of Barcelona’s most iconic church.
Renderings courtesy Eindhoven University of Technology / www.StrusturalIce.com.
Related Stories
| Nov 11, 2011
By the Numbers
What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 11, 2011
AIA: Engineered Brick + Masonry for Commercial Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Nov 11, 2011
How Your Firm Can Win Federal + Military Projects
The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.
| Nov 10, 2011
BD+C's 28th Annual Reconstruction Awards
A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.
| Nov 10, 2011
Grousbeck Center for Students & Technology opens doors
New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.
| Nov 10, 2011
Skanska Moss to expand and renovate Greenville-Spartanburg International Airport
The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard
| Nov 10, 2011
Thornton Tomasetti’s Joseph and Choi to co-chair the Council on Tall Buildings and Urban Habitat’s Outrigger Design Working Group
Design guide will describe in detail the application of outriggers within the lateral load resisting systems of tall buildings, effects on building behavior and recommendations for design.