Building castle-like ice sculptures isn’t only a thing in Disney movies anymore. Archdaily reports that a team of students from Eindhoven University is to build a 132-foot model of Antonio Gaudi’s Sagrada Familia in Juuka, Finland.
In order to achieve such heights the use of reinforced ice will be needed. A mixture of wooden fibers and plain ice will result in an ice-composite, so-called pykrete, which is three times stronger than plain ice.
According to the project team, the nave of the "Sagrada Familia in Ice" will be constructed by hanging ropes and freezing textiles. These ropes and textiles will also be a reinforcement of the ice.
The construction is planned to last a mere three weeks, a diminutive amount of time compared to the original’s 136 (and still ongoing) years!
Visit the project’s official website to learn more about this 1:4 scale ice model of Barcelona’s most iconic church.
Renderings courtesy Eindhoven University of Technology / www.StrusturalIce.com.
Related Stories
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
| Dec 12, 2011
AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year
SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment.
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.