Building castle-like ice sculptures isn’t only a thing in Disney movies anymore. Archdaily reports that a team of students from Eindhoven University is to build a 132-foot model of Antonio Gaudi’s Sagrada Familia in Juuka, Finland.
In order to achieve such heights the use of reinforced ice will be needed. A mixture of wooden fibers and plain ice will result in an ice-composite, so-called pykrete, which is three times stronger than plain ice.
According to the project team, the nave of the "Sagrada Familia in Ice" will be constructed by hanging ropes and freezing textiles. These ropes and textiles will also be a reinforcement of the ice.
The construction is planned to last a mere three weeks, a diminutive amount of time compared to the original’s 136 (and still ongoing) years!
Visit the project’s official website to learn more about this 1:4 scale ice model of Barcelona’s most iconic church.
Renderings courtesy Eindhoven University of Technology / www.StrusturalIce.com.
Related Stories
| Jan 26, 2012
HOK partners with USGBC on design of Haiti children's center
Passive design principles give form to a sustainable, restorative environment for the children of Haiti.
| Jan 26, 2012
American Standard names Gould as president and CEO
Gould succeeds Don Devine, who led the successful turnaround of American Standard Brands.
| Jan 26, 2012
Summit Design+Build completes law office in Chicago
Applegate & Thorne-Thomsen's new office suite features private offices, open office area, conference rooms, reception area, exposed wood beams and columns, and exposed brick.
| Jan 24, 2012
New iPad app ready for prime time
Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels.
| Jan 24, 2012
Vyhanek joins Thornton Tomasetti’s Kansas City office
Vyhanek will assemble a new MEP team in the Midwest to support Building Performance and Property Loss Consulting practices.
| Jan 24, 2012
U of M installs new lighting at Crisler Player Development Center
Energy efficient lighting installed at PDC reduce costs and improves player performance.
| Jan 24, 2012
Rockingham County Judicial Center receives USGBC Gold NC v.2.2
The Rockingham facility is the first judicial center in North Carolina to seek certification from the U.S. Green Building Council’s LEED Building rating system.
| Jan 19, 2012
LEED puts the 'Gold' in Riverside golden arches
McDonald's restaurant recognized for significant energy savings.
| Jan 19, 2012
Odebrecht and Braskem bring sustainable award to U.S. university students
The Odebrecht Award for sustainable development rewards future leaders in engineering and chemistry.
| Jan 19, 2012
BOKA Powell-designed facility at Texas A&M Bryan campus
The new facility provides programs for the Texas A&M Health Science Center, the Texas Brain and Spine Institute, Mary Crowley Cancer Research Centers, and Blinn College Allied Health programs.