Building castle-like ice sculptures isn’t only a thing in Disney movies anymore. Archdaily reports that a team of students from Eindhoven University is to build a 132-foot model of Antonio Gaudi’s Sagrada Familia in Juuka, Finland.
In order to achieve such heights the use of reinforced ice will be needed. A mixture of wooden fibers and plain ice will result in an ice-composite, so-called pykrete, which is three times stronger than plain ice.
According to the project team, the nave of the "Sagrada Familia in Ice" will be constructed by hanging ropes and freezing textiles. These ropes and textiles will also be a reinforcement of the ice.
The construction is planned to last a mere three weeks, a diminutive amount of time compared to the original’s 136 (and still ongoing) years!
Visit the project’s official website to learn more about this 1:4 scale ice model of Barcelona’s most iconic church.
Renderings courtesy Eindhoven University of Technology / www.StrusturalIce.com.
Related Stories
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.