GAF, North America’s largest roofing manufacturer, has just announced its 2012 “Text-For-A-Truck” sweepstakes, starting June 15th and running through August 31st. Similar to GAF’s 2011 truck promotion, professional roofing contractors or builders/remodelers in the U.S. can enter to win a Ford F-150 truck--but this time, the company is giving away five trucks and each is filled with a GAF Lifetime Roofing System.
Those eligible can enter simply by texting GAFTRUCK to 41411 from their mobile phone, visiting http://gaftextforatruck.com, by scanning a code that can be found on the promotional flyer, or by visiting http://m.gaftextforatruck.com from their mobile browser. A grand prize winner will be selected from each of GAF’s five sales areas, so each part of the U.S. will have a winner. In addition to the trucks, GAF will be awarding 10 Visa gift cards for $500 each and 25 worksite radios.
GAF is taking the contest even further this year by sponsoring events at distributor locations across the country to support the promotion. Contractors who attend these events will be treated to a lunch from GAF and be eligible to win lots of local prizes, including gift cards, hats, and t-shirts. One lucky contractor at each location will leave the event with a flat-screen television. The events will also feature a Ford F-150 truck so contractors can get a closer look at the prize.
Participating distributors will reach out to invite local contractors and will feature signage announcing the events. Contractors should also check the GAF Facebook page at www.facebook.com/gafroofing to find out when events are coming to their area. +
Related Stories
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 19, 2012
Mixed-use project redefines Midtown District in Plantation, Fla.
Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.
| Mar 14, 2012
Firestone names 2012 Master Contractor Award Winners
Annual award acknowledges industry’s top roofing professionals.
| Mar 14, 2012
Plans for San Francisco's tallest building revamped
The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.