GAF, North America’s largest roofing manufacturer, has just announced its 2012 “Text-For-A-Truck” sweepstakes, starting June 15th and running through August 31st. Similar to GAF’s 2011 truck promotion, professional roofing contractors or builders/remodelers in the U.S. can enter to win a Ford F-150 truck--but this time, the company is giving away five trucks and each is filled with a GAF Lifetime Roofing System.
Those eligible can enter simply by texting GAFTRUCK to 41411 from their mobile phone, visiting http://gaftextforatruck.com, by scanning a code that can be found on the promotional flyer, or by visiting http://m.gaftextforatruck.com from their mobile browser. A grand prize winner will be selected from each of GAF’s five sales areas, so each part of the U.S. will have a winner. In addition to the trucks, GAF will be awarding 10 Visa gift cards for $500 each and 25 worksite radios.
GAF is taking the contest even further this year by sponsoring events at distributor locations across the country to support the promotion. Contractors who attend these events will be treated to a lunch from GAF and be eligible to win lots of local prizes, including gift cards, hats, and t-shirts. One lucky contractor at each location will leave the event with a flat-screen television. The events will also feature a Ford F-150 truck so contractors can get a closer look at the prize.
Participating distributors will reach out to invite local contractors and will feature signage announcing the events. Contractors should also check the GAF Facebook page at www.facebook.com/gafroofing to find out when events are coming to their area. +
Related Stories
| May 10, 2012
Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond
Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.
| May 10, 2012
Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction
Certification for existing buildings under these two rating programs has overtaken that for new construction.
| May 10, 2012
Chapter 4 Business Case for High-Performance Reconstructed Buildings
Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.
| May 10, 2012
Chapter 3 How Building Technologies Contribute to Reconstruction Advances
Building Teams are employing a wide variety of components and systems in their reconstruction projects.
| May 10, 2012
Chapter 2 Exemplary High-Performance Reconstruction Projects
Several case studies show how to successfully renovate existing structures into high-performance buildings.
| May 9, 2012
Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings
As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.
| May 9, 2012
International green building speaker to keynote Australia’s largest building systems trade show
Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.
| May 9, 2012
Tishman delivers Revel six weeks early
Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.
| May 9, 2012
Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award
Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.