flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gafcon announces completion of Coronado animal care facility

Gafcon announces completion of Coronado animal care facility


By BD+C staff | August 11, 2010

Coronado Animal Care Facility

Gafcon Inc., a leading California-based construction management and consulting firm, announced today that construction is now complete on a new $1.6 million animal care facility located at 1395 First Street in Coronado, Calif.

Gafcon performed a constructability review and served as the construction manager for the 12-month project for the City of Coronado. The project involved the demolition of an existing parking lot adjacent to the Coronado Ferry Landing Marketplace and construction of a new 3,400-square-foot single-story concrete masonry building. The facility houses a variety of functional spaces including seven dog adoption areas, three cat community rooms, holding areas, quarantine areas, examination/treatment area, "get acquainted" room, food preparation space, grooming room and exterior dog exercise yard.

The facility was built to the U.S. Green Building Council's LEED Silver certification standards, incorporating a variety of sustainable elements including energy- and water-efficient fixtures, natural lighting, recycled building materials and construction waste recycling.

The new building reduces the environmental impact due to its proximity to public transportation, off-street parking for fuel-efficient vehicles, permeable concrete pavers and an infiltration system to reduce storm water runoff. The facility also reduces its potable water consumption through the use of water-efficient landscaping and artificial turf. The exterior masonry block walls utilized in the structure have a high recycled content and 50 percent of all wood products used are Forest Stewardship Council certified. The interior finishes all meet or exceed the standards for lowering indoor air contaminant levels and mechanical systems were flushed out prior to occupancy to further reduce volatile organic compounds. The project design also included multiple clerestory windows and skylights to optimize natural light and further reduce energy consumption.

The Gafcon project team included John Wilson, project manager; Penny Kronberg, constructability review/oversight; Anthony Trinca, constructability review; and Jamie Roberts, labor compliance.

Other members of the project team included Bill Cecil, capital projects manager for the City of Coronado; Davy Architecture, architect; Grahovac Construction, general contractor; Stedman Dyson, structural engineer; SB&O, civil engineer; Turpin & Rattan Engineering, electrical engineer; Rao Engineers, mechanical engineer; and Howard Associates, landscape architect.

The project was developed as the result of a joint-funding agreement between the City of Coronado and Pacific Animal Welfare Society, or PAWS, of Coronado. The previous shelter located on Orange Avenue was torn down to make way for senior housing units in 2006. Since that time, animal services have been housed in the basement of the Coronado Police Department.

The City of Coronado has retained Gafcon to provide construction management for a second project, the new Coronado Tennis Center.

About Gafcon Inc.
Founded in 1987 by Pam and Yehudi Gaffen, Gafcon Inc. is a leading development and construction management firm providing professional construction consulting, construction program management, real estate economics consulting, design management and construction-related claims support. The company employs more than 150 construction project managers architects, civil engineers, financial analysts, estimators, schedulers, quality inspectors and computer professionals. Gafcon maintains corporate headquarters in downtown San Diego, with branch offices in Irvine, Los Angeles and Oregon.

Related Stories

| Feb 9, 2011

Fortune 1000: Despite moral obligation to sustainability, cash is still king

Eighty-eight percent of Fortune 1000 senior executives feel business has a moral responsibility, beyond regulatory requirements, to make their companies more energy efficient, according to a new poll released today by Harris Interactive and commissioned by Schneider Electric. At the same time, the vast majority (61%) of respondents say that potential cost savings are their biggest motivator to save energy at the enterprise-level, outranking environmental concerns (13%) or government regulations (2%).

| Feb 9, 2011

Businesses make bigger, bolder sustainability commitments

In 2010, U.S. corporations continued to enhance their sustainable business efforts by making bigger, bolder, longer-term sustainability commitments. GreenBiz issued its 4th annual State of Green Business report, a free downloadable report that measures the progress of U.S. business and the economy from an environmental perspective, and highlights key trends in corporate culture in regard to the environment.

| Feb 7, 2011

President Obama cites PPG glass, coatings in Penn State speech

President Barack Obama yesterday acknowledged PPG Industries as a leader in the development of high-performance glass and coatings for energy-efficient buildings during a visit to Penn State University that kicked off the U.S. government’s “Better Buildings Initiative.’

| Feb 7, 2011

GSA Unveils New Sustainable Workplace Design Tool

The U.S. General Services Administration launched its Sustainable Facilities Tool on Monday, Feb. 7.  The innovative online tool will make it easier for both government and private-sector property managers and developers to learn about and evaluate strategies to make workplaces more sustainable, helping to build and create jobs in America’s clean energy economy of the future.

| Feb 4, 2011

U.S. Green Building Council applauds President Obama’s Green Building Initiative

The U.S. Green Building Council applauded a key element of President Obama’s plan to “win the future” by making America’s commercial buildings more energy- and resource-efficient over the next decade.  The President’s plan, entitled Better Buildings Initiative, catalyzes private-sector investment through a series of incentives to upgrade offices, stores, schools and universities, hospitals and other commercial and municipal buildings.

| Feb 4, 2011

President Obama: 20% improvement in energy efficiency will save $40 billion

President Obama’s Better Buildings Initiative, announced February 3, 2011, aims to achieve a 20% improvement in energy efficiency in commercial buildings by 2020, improvements that will save American businesses $40 billion a year.

| Jan 25, 2011

Bloomberg launches NYC Urban Tech Innovation Center

To promote the development and commercialization of green building technologies in New York City, Mayor Michael R. Bloomberg has launched the NYC Urban Technology Innovation Center. This initiative will connect academic institutions conducting underlying research, companies creating the associated products, and building owners who will use those technologies.

| Jan 25, 2011

Sherwin-Williams Zero-VOC Claim Misleading, Says BBB

In a move that could prompt industry-wide changes to claims about volatile organic compounds (VOCs), the Better Business Bureau’s National Advertising Division (NAD) has told Sherwin-Williams it should stop marketing its Harmony line of paints as “zero-VOC.” Sherwin-Williams said it will accept NAD’s decision and will take the findings into consideration in its future advertising.

| Jan 25, 2011

InterContinental Hotels Group gets LEED pre-certification

InterContinental Hotels Group, the world's largest hotel group by number of rooms, announced that its in-house sustainability system Green Engage has been awarded LEED volume pre-certification established from the USGBC and verified by the Green Building Certification Institute. IHG is the first hotel company to receive this award for an existing hotels program.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021