flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gafcon announces completion of Coronado animal care facility

Gafcon announces completion of Coronado animal care facility


By BD+C staff | August 11, 2010

Coronado Animal Care Facility

Gafcon Inc., a leading California-based construction management and consulting firm, announced today that construction is now complete on a new $1.6 million animal care facility located at 1395 First Street in Coronado, Calif.

Gafcon performed a constructability review and served as the construction manager for the 12-month project for the City of Coronado. The project involved the demolition of an existing parking lot adjacent to the Coronado Ferry Landing Marketplace and construction of a new 3,400-square-foot single-story concrete masonry building. The facility houses a variety of functional spaces including seven dog adoption areas, three cat community rooms, holding areas, quarantine areas, examination/treatment area, "get acquainted" room, food preparation space, grooming room and exterior dog exercise yard.

The facility was built to the U.S. Green Building Council's LEED Silver certification standards, incorporating a variety of sustainable elements including energy- and water-efficient fixtures, natural lighting, recycled building materials and construction waste recycling.

The new building reduces the environmental impact due to its proximity to public transportation, off-street parking for fuel-efficient vehicles, permeable concrete pavers and an infiltration system to reduce storm water runoff. The facility also reduces its potable water consumption through the use of water-efficient landscaping and artificial turf. The exterior masonry block walls utilized in the structure have a high recycled content and 50 percent of all wood products used are Forest Stewardship Council certified. The interior finishes all meet or exceed the standards for lowering indoor air contaminant levels and mechanical systems were flushed out prior to occupancy to further reduce volatile organic compounds. The project design also included multiple clerestory windows and skylights to optimize natural light and further reduce energy consumption.

The Gafcon project team included John Wilson, project manager; Penny Kronberg, constructability review/oversight; Anthony Trinca, constructability review; and Jamie Roberts, labor compliance.

Other members of the project team included Bill Cecil, capital projects manager for the City of Coronado; Davy Architecture, architect; Grahovac Construction, general contractor; Stedman Dyson, structural engineer; SB&O, civil engineer; Turpin & Rattan Engineering, electrical engineer; Rao Engineers, mechanical engineer; and Howard Associates, landscape architect.

The project was developed as the result of a joint-funding agreement between the City of Coronado and Pacific Animal Welfare Society, or PAWS, of Coronado. The previous shelter located on Orange Avenue was torn down to make way for senior housing units in 2006. Since that time, animal services have been housed in the basement of the Coronado Police Department.

The City of Coronado has retained Gafcon to provide construction management for a second project, the new Coronado Tennis Center.

About Gafcon Inc.
Founded in 1987 by Pam and Yehudi Gaffen, Gafcon Inc. is a leading development and construction management firm providing professional construction consulting, construction program management, real estate economics consulting, design management and construction-related claims support. The company employs more than 150 construction project managers architects, civil engineers, financial analysts, estimators, schedulers, quality inspectors and computer professionals. Gafcon maintains corporate headquarters in downtown San Diego, with branch offices in Irvine, Los Angeles and Oregon.

Related Stories

| Sep 28, 2011

Opus Group awarded contract for new Church & Dwight Co. headquarters

The campus will include two 125,000-sf Class A, energy-efficient office buildings that will be designed and constructed with sustainable practices and elements. 

| Sep 23, 2011

Okanagan College sets sights on Living Buildings Challenge

The Living Building Challenge requires projects to meet a stringent list of qualifications, including net-zero energy and water consumption, and address critical environmental, social and economic factors. 

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| Sep 19, 2011

Portland team hired as LEED and commissioning consultants for $5.5B downtown sustainable project in Qatar

The $5.5 billion sustainable downtown regeneration project underway by Msheireb Properties will transform a 76 acres site at the centre of Doha, Qatar’s capital city, recreating a way of living that is rooted in Qatari culture, attracting residents back to the city center and reversing the trend for decentralization.

| Sep 14, 2011

Empire State Building achieves LEED Gold ?

The 2.85 million-sf building is celebrating its 80th anniversary while nearing completion of its renewal and repurposing to meet the needs of 21st Century businesses.

| Sep 12, 2011

Construction waste management

Best practices for an environmentally optimized job site.

| Sep 12, 2011

Scan, Deconstruct, Rebuild

How laser scanning helped improve construction schedules, plans, and final designs for a major reconstruction project.

| Sep 12, 2011

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

Putting a stamp on USPS's first green roof

The Morgan Building roof totals 150,000-sf. In addition to a vegetated green roof, other roof areas were upgraded and included 55,000-sf of reflective concrete pavers and ballast, which were also placed over a Sarnafil waterproofing membrane, and 40,000-sf of EnergySmart Roof—a reflective, energy-efficient vinyl roofing system from Sika Sarnafil.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021