flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gables Residential brings mixed-use building to Houston's Tanglewood area

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.


By By BD+C Staff | December 5, 2011
Gables residential ziegler cooper architects houston
The 8-story, 316 unit, concrete frame building will include a rooftop pool terrace, club room and outdoor living with views of t

Atlanta-based Gables Residential recently hired Ziegler Cooper Architects to create an upscale mixed-use development located in the Tanglewood area, just west of Houston’s Galleria.

The 8-story, 316 unit, concrete frame building will include a rooftop pool terrace, club room and outdoor living with views of the Galleria and Uptown. Other amenities include: lounge, dining room, theatre, fitness, outdoor kitchen and living room. A courtyard, the new home for an old oak tree that will be transplanted from the existing site, will also connect both retail and parking.

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

Bering will break ground in November 2011 adding 301,801 sf of luxury apartment living and 22,000 sf of boutique retail to activate the street scene of this upscale urban development. The project is scheduled to break ground November 2011 and estimated completion is May 2013. Bering will break ground in November 2011 adding 301,801 sf of luxury apartment living and 22,000 sf of boutique retail to activate the street scene of this upscale urban development. The project is scheduled to break ground November 2011 and estimated completion is May 2013. BD+C

Related Stories

| May 25, 2011

Low Impact Development: Managing Stormwater Runoff

Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.

| May 25, 2011

Register today for BD+C’s June 8th webinar on restoration and reconstruction projects

Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.

| May 25, 2011

Hotel offers water beds on a grand scale

A semi-submerged resort hotel is the newest project from Giancarlo Zema, a Rome-based architect known for his organic maritime designs. The hotel spans one kilometer and has both land and sea portions.

| May 25, 2011

Smithsonian building $45 million green lab

Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.

| May 25, 2011

World’s tallest building now available in smaller size

Emaar Properties teamed up with LEGO to create a miniature version of the Burj Khalifa as part of the LEGO Architecture series. Currently, the LEGO Burj Khalifa is available only in Dubai, but come June 1, 2011, it will be available worldwide.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021