flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gables Residential brings mixed-use building to Houston's Tanglewood area

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.


By By BD+C Staff | December 5, 2011
Gables residential ziegler cooper architects houston
The 8-story, 316 unit, concrete frame building will include a rooftop pool terrace, club room and outdoor living with views of t

Atlanta-based Gables Residential recently hired Ziegler Cooper Architects to create an upscale mixed-use development located in the Tanglewood area, just west of Houston’s Galleria.

The 8-story, 316 unit, concrete frame building will include a rooftop pool terrace, club room and outdoor living with views of the Galleria and Uptown. Other amenities include: lounge, dining room, theatre, fitness, outdoor kitchen and living room. A courtyard, the new home for an old oak tree that will be transplanted from the existing site, will also connect both retail and parking.

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

Bering will break ground in November 2011 adding 301,801 sf of luxury apartment living and 22,000 sf of boutique retail to activate the street scene of this upscale urban development. The project is scheduled to break ground November 2011 and estimated completion is May 2013. Bering will break ground in November 2011 adding 301,801 sf of luxury apartment living and 22,000 sf of boutique retail to activate the street scene of this upscale urban development. The project is scheduled to break ground November 2011 and estimated completion is May 2013. BD+C

Related Stories

| Dec 9, 2011

BEST AEC FIRMS 2011: EYP Architecture & Engineering

Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

| Dec 8, 2011

HDR opens office in Shanghai

The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia. 

| Dec 8, 2011

HOK elevates the green office standard

Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.

| Dec 7, 2011

ACE Mentor Program receives Presidential Award for Excellence in Science, Math and Engineering Mentoring

Thornton Tomasetti founding principal Charles H. Thornton responsible for launching ACE.

| Dec 7, 2011

NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings

TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.

| Dec 7, 2011

DPR Foundation awards $590,000 to youth organizations

Grants will fund programs for disadvantaged kids across six states.

| Dec 7, 2011

Autodesk agrees to acquire Horizontal Systems

Acquisition extends and accelerates cloud-based BIM solutions for collaboration, data, and lifecycle management.

| Dec 7, 2011

ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan

The facility's design highlights the inherent link between environmental consciousness and religious reverence.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021