Atlanta-based Gables Residential recently hired Ziegler Cooper Architects to create an upscale mixed-use development located in the Tanglewood area, just west of Houston’s Galleria.
The 8-story, 316 unit, concrete frame building will include a rooftop pool terrace, club room and outdoor living with views of the Galleria and Uptown. Other amenities include: lounge, dining room, theatre, fitness, outdoor kitchen and living room. A courtyard, the new home for an old oak tree that will be transplanted from the existing site, will also connect both retail and parking.
The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.
Bering will break ground in November 2011 adding 301,801 sf of luxury apartment living and 22,000 sf of boutique retail to activate the street scene of this upscale urban development. The project is scheduled to break ground November 2011 and estimated completion is May 2013. Bering will break ground in November 2011 adding 301,801 sf of luxury apartment living and 22,000 sf of boutique retail to activate the street scene of this upscale urban development. The project is scheduled to break ground November 2011 and estimated completion is May 2013. BD+C
Related Stories
BIM and Information Technology | Apr 9, 2015
A carboard box by Google can bring virtual reality to architecture
The global search engine giant has launched a new product, Google Cardboard, that easily allows users to experience virtual reality.
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”