flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gables Residential brings mixed-use building to Houston's Tanglewood area

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.


By By BD+C Staff | December 5, 2011
Gables residential ziegler cooper architects houston
The 8-story, 316 unit, concrete frame building will include a rooftop pool terrace, club room and outdoor living with views of t

Atlanta-based Gables Residential recently hired Ziegler Cooper Architects to create an upscale mixed-use development located in the Tanglewood area, just west of Houston’s Galleria.

The 8-story, 316 unit, concrete frame building will include a rooftop pool terrace, club room and outdoor living with views of the Galleria and Uptown. Other amenities include: lounge, dining room, theatre, fitness, outdoor kitchen and living room. A courtyard, the new home for an old oak tree that will be transplanted from the existing site, will also connect both retail and parking.

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

Bering will break ground in November 2011 adding 301,801 sf of luxury apartment living and 22,000 sf of boutique retail to activate the street scene of this upscale urban development. The project is scheduled to break ground November 2011 and estimated completion is May 2013. Bering will break ground in November 2011 adding 301,801 sf of luxury apartment living and 22,000 sf of boutique retail to activate the street scene of this upscale urban development. The project is scheduled to break ground November 2011 and estimated completion is May 2013. BD+C

Related Stories

Architects | May 14, 2018

4 tactics for our digital transformation

While our technology is becoming more advanced, the fundamental processes at the core of design and construction businesses have largely remained unchanged for decades.

Architects | May 8, 2018

WeWork names BIG’s Ingels as its Chief Architect

He’ll be plenty busy working with a company that has aggressive growth ambitions.

Architects | May 8, 2018

Illinois Office of Tourism unveils new Frank Lloyd Wright Trail

The trail stretches from Rockford to Springfield.

Architects | May 3, 2018

Designing innovative solutions for chronic homelessness

What’s stopping us from creating more Permanent Supportive Housing? 

Architects | Apr 27, 2018

4 reasons to pursue speaking engagements

We found speaking engagements were among the top ten marketing techniques that AEC firms employ.

Office Buildings | Apr 19, 2018

From fitness to bowling alleys: How commercial office buildings are differentiating themselves through amenities

Here are five ways that amenities can help developers and building owners attract and secure tenants by appealing to their inhabitants.

Architects | Apr 19, 2018

Perkins Eastman and Dougherty announce intent to merge

Combined practice will create expanded capabilities for K-12, higher education projects in California.

Architects | Apr 17, 2018

Cannon Design expects merger with gkkworks will help streamline its deliveries

The combined firm reinforces its presence in the western U.S.

Architects | Apr 16, 2018

Is the AEC industry ready to shake off its retrograde image?

Technology has been and always will be perceived as a source for wonder and worry.

Architects | Apr 10, 2018

HOK names a physician as its new Chief Medical Officer

Dr. Andrew Ibrahim will collaborate with the firm’s medical planning and design teams.    

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021