flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Furniture Sustainability Standard - Approved by ANSI and Released for Distribution

Furniture Sustainability Standard - Approved by ANSI and Released for Distribution


January 4, 2011

Grand Rapids, MI - BIFMA International recently announced formal American National Standards Institute (ANSI) approval and release of the ANSI/BIFMA e3-2010 Furniture Sustainability Standard. The e3 standard represents a structured methodology to evaluate the "sustainable" attributes of furniture products and constitutes the technical criteria of the level product certification program.

Modeled after the LEED rating system, the e3 standard includes six prerequisites and numerous optional credit criteria. As a product is determined to conform to the various optional criteria, points are accumulated toward an ultimate score and corresponding conformance tier.  A minimum of 32 points (of the 90 total available) must be achieved in order to reach the first conformance threshold.

This standard is the result of an extraordinary amount of development work on the part of numerous stakeholders representing a broad cross section of disciplines, backgrounds and perspectives.

Copies of the standard are available from BIFMA, contact Roxanne DeBoer at BIFMA International for further information: email@bifma.org.  Standards can also be ordered online at the BIFMA website. https://bifma.org/secure/orderform.html

About BIFMA

BIFMA is a not-for-profit organization who’s mission includes the development of voluntary product and industry standards that support safe, healthy and sustainable environments; publishing of key industry statistics; advocating for legislation and government regulation that have a direct impact on the health of the industry; and facilitating meaningful dialog and education to support our core services and the industry.

Related Stories

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 14, 2012

Hyatt joins Thornton Tomasetti as VP in Chicago

A forensic specialist, Hyatt has more than 10 years of experience performing investigations of structural failures throughout the U.S.

| Mar 14, 2012

Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.

Building will house research into personalized, gene-based cancer screening and treatment.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021