flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fully electric Oregon elementary school aims for resilience with microgrid design

K-12 Schools

Fully electric Oregon elementary school aims for resilience with microgrid design

River Grove Elementary School is one of the first American schools to feature a microgrid design.


By Peter Fabris, Contributing Editor | April 30, 2024
River Grove Elementary School in Oregon Rendering: Arcadis
Rendering: Arcadis

River Grove Elementary School in Lake Oswego, Ore., was designed to be fully electric and resilient to natural disasters such as seismic events, storms, and wildfire. The roughly 78,000-sf school in a Portland suburb will feature a microgrid—a small-scale power grid that can operate independently from the area’s electric grid.

Design of the microgrid system was developed through a collaboration between the school district and the local utility provider. River Grove will be one of the first American schools to be constructed with a microgrid.

The structure is designed to a higher seismic factor as a Category IV building to serve as a resource for the local community in the event of an earthquake or other natural disaster. Portions of the building will continue to function during a prolonged power outage thanks to the large photovoltaic array and battery energy storage system.

The building has a sophisticated heating, cooling, and ventilation system, a critical feature in an area experiencing soaring temperatures during heatwaves in recent years. The region has also been impacted by smoke-filled air from forest fires and ice storms causing power outages for weeks.

River Grove is a replacement of a 1967 elementary school that existed on the same site. The previous 68,846 sf school was fully demolished, and students moved off-site to another school during construction.

The new school will provide classrooms, extended learning areas, an innovation lab, music room, stage, library, administration offices, gymnasium, kitchen, an outdoor covered play area, outdoor learning spaces, and play fields. The building is designed for a capacity of 600. The previous facility had a capacity of 575.

Construction kicked off in June 2022, with completion expected for the school’s opening in Fall 2024.

Owner and/or Developer: Lake Oswego School District
Design Architect: Arcadis
Architect of Record: Arcadis
MEP Engineer: Glumac
Structural Engineer: KPFF
General Contractor: Triplett Wellman  

River Grove Elementary School in Oregon Rendering: Arcadis
Rendering: Arcadis
River Grove Elementary School in Oregon Rendering: Arcadis
Rendering: Arcadis
River Grove Elementary School in Oregon Rendering: Arcadis
Rendering: Arcadis

Related Stories

K-12 Schools | May 16, 2017

The future of schools: Net zero should be the norm

Students are helping drive change by focusing on the future.

K-12 Schools | May 1, 2017

Seattle’s first vertically-oriented middle school breaks ground

The building will provide 74,289 sf of space across its five-story classroom bar.

K-12 Schools | Apr 21, 2017

The stadium effect

School districts that invested in their athletic facilities over the last few years have seen a tremendous increase in student morale and health, growth in campus culture, and excitement within their communities.

K-12 Schools | Apr 7, 2017

Is an alternative project delivery method right for your K-12 school district?

With California’s increasingly busy—and costly—construction market, it’s becoming more difficult to predict costs with a typical design-bid-build delivery method.

K-12 Schools | Mar 9, 2017

The future of education facilities: Creating spaces where learning happens everywhere

The art of designing schools lies not in just understanding what makes a functional classroom, but in how successful we are in creating a wide array of educational options for teachers and students within the school environment.

K-12 Schools | Mar 9, 2017

School branding: The impact on identity and engagement

What is school branding and why is it important? HMC Architects’ James Krueger and Barbara Perez weigh in on the topic.

K-12 Schools | Feb 22, 2017

Through the principal's eyes: A look at K-12 architecture

Anderson-Livsey is a K-5 school located about 30 minutes East of Atlanta in Gwinnett County and has an enrollment of 785 students. 

K-12 Schools | Feb 8, 2017

'Fabrication Hall' introduces Wyoming high school students to career paths

The hall offers bountiful natural light with enough space to build large-scale projects.

Architects | Jan 19, 2017

Harley Ellis Devereaux merges with Deems Lewis McKinley

The combination is expected to bolster HED’s presence in northern California and the K-12 sector.

K-12 Schools | Dec 14, 2016

Expanding possibilities for America's K-12 schools

Bigger buildings, more outdoor space, and greater involvement from the private sector are among the trends marking the new generation of schools. 

boombox1
boombox2
native1

More In Category




K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021