flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fueling a grocer's rapid expansion

Sponsored Content Concrete

Fueling a grocer's rapid expansion

Fabcon has worked closely with Hy-Vee’s architects and designers to produce a custom finish for their precast panels.


By Fabcon | April 4, 2017

Fabcon Precast worked with Hy-Vee to create a custom finish to help differentiate the stores and create a more premium feel to the stores.

Hy-Vee grocery has established itself as one of the top 25 grocery retailers in the country. The organization has built 240 stores throughout eight midwestern states and employs over 85,000 people. A common thread to the grocery chain’s expansion? Fabcon Precast.

 

DIFFERENT BUSINESSES. A COMMON APPROACH

As the go-to provider of precast concrete panels for many grocery chains throughout the country, Hy-Vee looks to Fabcon for expertise in both the production of precast panels and the build-out of its stores.

“The biggest thing for grocery – and retail clients in general – is speed of construction,” said Fabcon’s Matt Smith. “They want to get the registers up and running as quickly as possible. The fastest way to do that is with precast.” While speed is always vital, the grocer has grown to appreciate our service throughout the entirety of a project. And much like itself, also the way we’ve proven to help them keep costs in check.

 

CLIMATE CONSIDERATIONS, INSIDE & OUT

“Like many of the grocers we work with,” said Fabcon’s Don Johnson, “Hy-Vee gravitates to our 12” VersaCore+Green™ sandwich panels and their impressive R-value of 28.2.”

Featuring edge-to-edge insulation, these panels meet energy efficiency requirements and are effective at maintaining a comfortable shopping environment, regardless of climate. This helps to enhance the customer experience, but it also saves plenty of money in heating and cooling throughout the life of a store.

Not all grocery stores are created equal. And Hy-Vee is no exception. So if the in-store experience was so much better than its competitors, why look like everyone else? Fabcon has worked closely with Hy-Vee’s architects and designers to produce a custom finish for their precast panels. This helps the chain’s stores stand out from the pack. And create a positive impression of the brand the moment a customer approaches the store.

 

Experienced crews and better engineering insure that Fabcon walls go up fast making room for other subcontractors to get to work quicker.

 

QUICK TO BUILD. QUICKER TO MARKET

“Because of the close working relationships, all parties at the table develop a kind of “short hand” when working with architects, general contractors and management from the grocery chains,” said Johnson. “’It’s just like the one we built in Cedar Rapids,’ for example, that only serves to speed up the process and eliminate pitfalls along the way.”

This means that from the plant to the install crews, many of our employees have direct experience with a Hy-Vee project. And it shows as subsequent builds go that much easier. With multiple production facilities, we’re able to produce the required panels to handle multiple projects at one time.

“On the larger end of things, there are always efficiencies when you repeat a design,” said Smith. “Even if the architect is designing buildings in several states, you’re not starting from scratch each time – both in terms of production and build-out.” This is how Hy-Vee moves so quickly from Ground Breaking to Grand Opening.

Then it’s off to the next store and another call to Fabcon Precast

Related Stories

| Jan 19, 2012

LEED puts the 'Gold' in Riverside golden arches

McDonald's restaurant recognized for significant energy savings.

| Jan 19, 2012

Odebrecht and Braskem bring sustainable award to U.S. university students

The Odebrecht Award for sustainable development rewards future leaders in engineering and chemistry.

| Jan 8, 2012

TCA releases The Construction of Tilt-Up

The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up

| Jan 4, 2012

HDR to design North America’s first fully digital hospital

Humber River  is the first hospital in North America to fully integrate and automate all of its processes; everything is done digitally.

| Jan 3, 2012

VDK Architects merges with Harley Ellis Devereaux

Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the new Oakland office location effective January 3, 2012.

| Jan 3, 2012

New Chicago hospital prepared for pandemic, CBR terror threat

At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters. 

| Jan 3, 2012

AIA Course: New Developments in Concrete Construction

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Dec 20, 2011

BCA’s Best Practices in New Construction available online

This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 19, 2011

Summit Design+Build selected as GC for Chicago recon project

The 130,000 square foot building is being completely renovated.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021