Jason Freeland, who was recently named to Building Design+Construction’s 40 Under 40 Class of 2012, has been promoted to vice president at Heery International.
In his new position, Freeland serves as the director of Heery’s health facilities design studio in Atlanta. He is responsible for strategic direction, marketing and operations for all of the studio’s health care projects.
Freeland has more than 12 years of experience in designing health care facilities, with a focus on acute care hospitals, ambulatory care centers, and wellness campus master planning. He has worked with a wide variety of clients, ranging from local institutions to large health care management corporations, as well as federal agencies such as the Department of Defense and Department of Veterans Affairs. Some of his recent projects include: lead design architect and planner for a major replacement hospital master plan and concept design in Kaiserslautern, Germany; a master facility plan for a 1.5-million-square-foot wellness campus and acute care hospital in Moreno Valley, California; and design for a 315-bed inpatient tower addition in San Juan, Puerto Rico.
A registered architect in Georgia and Tennessee, Freeland received a bachelor of architecture degree from the University of Kentucky and is currently pursuing an MBA at Emory University’s Goizueta Business School.
He is a member of the American Institute of Architects, a LEED-accredited professional, and a certified member of the American College of Healthcare Architects. BD+C
Related Stories
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Eidco Construction bolsters Chicago office
Eldco hires Peterson and Vivoda as senior project managers.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 29, 2012
C.W. Driver opens new office, appoints Castillo regional SVP
Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.