flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fraser Brown MacKenna wins Green Gown Award

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.


By By BD+C Staff | December 5, 2011
Fraser Brown MacKenna Green Gown Award GE Fogg Building
Once uneconomic to heat and suffering from extreme solar glare, the concrete structure of the building was corroded and the wind

Fraser Brown MacKenna Architects has won the Sustainable Construction and Refurbishment category of the Green Gown Awards 2011 for the recladding of the GE Fogg Building at Queen Mary, University of London.

Once uneconomic to heat and suffering from extreme solar glare, the concrete structure of the building was corroded and the windows were leaking. Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building to:

  • Increase the insulation of the existing opaque walls
  • Install new high performance glazing throughout
  • Include monocrystalline PV cells on parts of the south and south-east facing elevations and sloped roofs.

The GE Fogg Building houses the School of Biological and Chemical Sciences and remained in occupation throughout the duration of the project. Working closely with building occupiers, the team overcame the logistical challenges of working around live laboratories and a building which bridges a public highway, installing rainscreen cladding and curtain walling across the complex building geometry. BD+C

Related Stories

| Nov 22, 2011

New Green Matters Conference examines emerging issues in concrete and sustainability

High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.

| Nov 22, 2011

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.

| Nov 22, 2011

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.

| Nov 21, 2011

Mortenson and enXco partnership to build its 19th wind project

The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.

| Nov 21, 2011

FDH Engineering acquires Energy Solutions

All ESI employees have been merged into FDH’s staff at its St. Louis office.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

SmithGroup changes name to SmithGroupJJR

SmithGroup and JJR join brands to become a single, multi-disciplinary company.

| Nov 17, 2011

Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings

Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021