flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fraser Brown MacKenna wins Green Gown Award

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.


By By BD+C Staff | December 5, 2011
Fraser Brown MacKenna Green Gown Award GE Fogg Building
Once uneconomic to heat and suffering from extreme solar glare, the concrete structure of the building was corroded and the wind

Fraser Brown MacKenna Architects has won the Sustainable Construction and Refurbishment category of the Green Gown Awards 2011 for the recladding of the GE Fogg Building at Queen Mary, University of London.

Once uneconomic to heat and suffering from extreme solar glare, the concrete structure of the building was corroded and the windows were leaking. Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building to:

  • Increase the insulation of the existing opaque walls
  • Install new high performance glazing throughout
  • Include monocrystalline PV cells on parts of the south and south-east facing elevations and sloped roofs.

The GE Fogg Building houses the School of Biological and Chemical Sciences and remained in occupation throughout the duration of the project. Working closely with building occupiers, the team overcame the logistical challenges of working around live laboratories and a building which bridges a public highway, installing rainscreen cladding and curtain walling across the complex building geometry. BD+C

Related Stories

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

DSGW Architects welcomes new employees

Three new employees located in DSGW's Duluth office.

| Aug 9, 2012

DMR Architects converts bank building to municipal court

The project consisted of a $4 million renovation to a 2-story building totaling 13,000-sf.

| Aug 8, 2012

BD+C wins six B2B journalism awards

BD+C wins two national awards, three regional awards, and a regional Graphical Excellence award.

| Aug 8, 2012

BIM’s future up in the cloud

The AEC industry is on the cusp of a still more significant evolution with cloud computing.

| Aug 8, 2012

Giants 300 Sports Facilities Report

BD+C's Giants 300 Top 25 AEC Firms in the Sports Facilities sector.

| Aug 8, 2012

Giants 300 Science & Technology Report

BD+C's Giants 300 Top 25 AEC Firms in the Science & Technology sector.

| Aug 7, 2012

Pioneering revival

Financial setbacks didn’t stop this Building Team from transforming the country’s first women’s medical school into a new home for college students.

| Aug 7, 2012

Shedding light on the arts

Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021