flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Franklin Institute in Philadelphia selects Skanska to construct new pavilion

Franklin Institute in Philadelphia selects Skanska to construct new pavilion

The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.


By By BD+C Staff | March 5, 2012
Total design, construction and fit-out for the building addition will generate 1
Total design, construction and fit-out for the building addition will generate 150,000 hours of work and 125 jobs in constructio

Franklin Institute selected Skanska USA to construct its ambitious new building addition, the Nicholas and Athena Karabots Pavilion.

The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.

Total design, construction and fit-out for the building addition will generate 150,000 hours of work and 125 jobs in construction, design and consulting in Philadelphia, as well as 20 additional full-time or full-time equivalent jobs at The Franklin Institute. 

Interior components of the 53,000 square foot Nicholas and Athena Karabots Pavilion include an education and conference center, a permanent exhibition entitled Your Brain, and a changing exhibition gallery. The exterior of the building will be clad in the same Indiana limestone as the original building, and will incorporate decidedly modern features, such as extensive landscaping that mitigates stormwater drainage and a dramatic stainless steel kinetic “shimmer wall” by artist Ned Kahn. BD+C

Related Stories

| May 7, 2012

2012 BUILDING TEAM AWARDS: Fort Belvoir Community Hospital

A new military hospital invokes evidence-based design to create a LEED-certified facility for the nation’s soldiers and their families.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

| May 3, 2012

U of Michigan team looking to create highly efficient building envelope designs

The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

| May 3, 2012

Zero Energy Research Lab opens at North Texas

The living lab—the only one of its kind in Texas—is designed to test various technologies and systems in order to achieve a net-zero consumption of energy.

| May 3, 2012

NSF publishes ANSI standard evaluating the sustainability of single ply roofing membranes

New NSF Standard provides manufacturers, specifiers and building industry with verifiable, objective criteria to identify sustainable roofing products.

| May 3, 2012

Gilbane to provide CM services for North Reading’s integrated middle/high school

The project scope includes a wastewater treatment plant, demolition of the existing high school and extensive athletic fieldwork.

| May 3, 2012

Howard S. Turner 1911–2012

A founding member of the Turner Construction Co.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021