Franklin Institute selected Skanska USA to construct its ambitious new building addition, the Nicholas and Athena Karabots Pavilion.
The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.
Total design, construction and fit-out for the building addition will generate 150,000 hours of work and 125 jobs in construction, design and consulting in Philadelphia, as well as 20 additional full-time or full-time equivalent jobs at The Franklin Institute.
Interior components of the 53,000 square foot Nicholas and Athena Karabots Pavilion include an education and conference center, a permanent exhibition entitled Your Brain, and a changing exhibition gallery. The exterior of the building will be clad in the same Indiana limestone as the original building, and will incorporate decidedly modern features, such as extensive landscaping that mitigates stormwater drainage and a dramatic stainless steel kinetic “shimmer wall” by artist Ned Kahn. BD+C
Related Stories
| Jun 1, 2012
AIA 2030 Commitment Program reports new results
The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.
| Jun 1, 2012
Robert Wilson joins SmithGroupJJR
Wilson makes the move to SmithGroupJJR from VOA Associates, Inc., where he served as a senior vice president and technical director in its Chicago office.
| Jun 1, 2012
Gilbane Building's Sue Klawans promoted
Industry veteran tasked with boosting project efficiency and driving customer satisfaction, to direct operational excellence efforts.
| Jun 1, 2012
Ground broken for Children’s Hospital Colorado South Campus
Children’s Hospital Colorado expects to host nearly 80,000 patient visits at the South Campus during its first year.
| Jun 1, 2012
K-State Olathe Innovation Campus receives LEED Silver
Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.
| Jun 1, 2012
New York City Department of Buildings approves 3D BIM site safety plans
3D BIM site safety plans enable building inspectors to take virtual tours of construction projects and review them in real-time on site.
| May 31, 2012
Product Solutions June 2012
Curing agents; commercial faucets; wall-cladding systems.
| May 31, 2012
8 steps to a successful BIM marketing program
It's not enough to have BIM capability--you have to know how to sell your BIM expertise to clients and prospects.
| May 31, 2012
3 Metal Roofing Case Studies Illustrate Benefits
Metal roofing systems offer values such as longevity, favorable life cycle costs, and heightened aesthetic appeal.
| May 31, 2012
AIA Course: High-Efficiency Plumbing Systems for Commercial and Institutional Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.