Franklin Institute selected Skanska USA to construct its ambitious new building addition, the Nicholas and Athena Karabots Pavilion.
The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.
Total design, construction and fit-out for the building addition will generate 150,000 hours of work and 125 jobs in construction, design and consulting in Philadelphia, as well as 20 additional full-time or full-time equivalent jobs at The Franklin Institute.
Interior components of the 53,000 square foot Nicholas and Athena Karabots Pavilion include an education and conference center, a permanent exhibition entitled Your Brain, and a changing exhibition gallery. The exterior of the building will be clad in the same Indiana limestone as the original building, and will incorporate decidedly modern features, such as extensive landscaping that mitigates stormwater drainage and a dramatic stainless steel kinetic “shimmer wall” by artist Ned Kahn. BD+C
Related Stories
| Aug 21, 2012
Under 40 Leadership Summit slated for October 3-5 in Chicago
Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.
| Aug 21, 2012
Hong Kong’s first LEED Platinum pre-certified building opens
Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.
| Aug 21, 2012
Stellar wins four ABC Excellence In Construction awards
ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.
| Aug 20, 2012
Protecting the artifacts at George H.W. Bush Presidential Library and Museum
Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.
| Aug 17, 2012
Ferreri joins PGAL as Principal
Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.
| Aug 17, 2012
Centric Architecture and PLAD Studio merge
The new firm will retain Centric Architecture as its name.
| Aug 15, 2012
MBH Architects announces new appointments
MBH Architects continues to grow, take on new clients.
| Aug 15, 2012
Architects and designers challenged in Allsteel’s reality design competition
KITS mobile app offers flexibility in planning.
| Aug 14, 2012
Leo A Daly welcomes Carl Gentilcore
Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.
| Aug 14, 2012
SOM Foundation announces prize recipients for 2012
Submissions for the SOM Prize were received from students at 34 schools in the U.S.