flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Frank Lloyd Wright’s Taliesin school of architecture faces accreditation loss

Frank Lloyd Wright’s Taliesin school of architecture faces accreditation loss

If the school does not find a partner institution before 2017, Taliesin School may lose its ability to confer Master of Architecture students.


By BD+C Staff | August 27, 2014
Taliesin, Frank Lloyd Wright School at risk of losing accreditation
Taliesin, Frank Lloyd Wright School at risk of losing accreditation

Eighty-two years after its founding by its storied namesake, the Frank Lloyd Wright School of Architecture is currently at risk of losing its accreditation.

According to Archdaily, the school no longer meets the revised requirements by the Higher Learning Commission, a non-profit group whose approval is mandatory for the National Architectural Accrediting Board's accreditation process.

The HLC by-laws were revised in 2012 so that colleges would require accreditation organizations other than the sponsoring one to accredit them.

The Frank Lloyd Wright School is currently funded as part of the Frank Lloyd Wright Foundation, Archdaily reports, which supports both of the school’s campuses and preserves an archive of Wrights work. Under the revised by-law, the Frank Lloyd Wright School of Architecture would need to file for incorporation as an institution with a primary purpose of offering higher education.

As of now, the school, located at Taliesin West in Scottsdale, Ariz., and Taliesin in Spring Green, Wis., will retain its accreditation through 2017, but it must find an accredited institution to partner before then to offer an advanced architecture degree and maintain accreditation, USA Today reports.

“I’m disappointed. I’m frustrated,” the Frank Lloyd Wright Foundation’s president, Sean Malone, told USA Today. “That said, I’m not worried about there not being any interest in a partnership.”

Related Stories

Data Centers | Apr 14, 2023

JLL's data center outlook: Cloud computing, AI driving exponential growth for data center industry

According to JLL’s new Global Data Center Outlook, the mass adoption of cloud computing and artificial intelligence (AI) is driving exponential growth for the data center industry, with hyperscale and edge computing leading investor demand.

Healthcare Facilities | Apr 13, 2023

Healthcare construction costs for 2023

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

Higher Education | Apr 13, 2023

Higher education construction costs for 2023

Fresh data from Gordian breaks down the average cost per square foot for a two-story college classroom building across 10 U.S. cities.

K-12 Schools | Apr 13, 2023

Creating a sense of place with multipurpose K-12 school buildings

Multipurpose buildings serve multiple program and functional requirements. The issue with many of these spaces is that they tend not to do any one thing well.

Healthcare Facilities | Apr 13, 2023

Urgent care facilities: Intentional design for mental and behavioral healthcare

The emergency department (ED) is the de-facto front door for behavior health crises, and yet these departments are understaffed, overwhelmed, and ill-equipped to navigate the layered complexities of highly demanding physical and behavioral health needs.

Office Buildings | Apr 13, 2023

L.A. headquarters for startup Califia Farms incorporates post-pandemic hybrid workplace design concepts

The new Los Angeles headquarters for fast-growing Califia Farms, a brand of dairy alternative products, was designed by SLAM with the post-Covid hybrid work environment in mind. Located in Maxwell Coffee House, a historic production facility built in 1924 that has become a vibrant mixed-use complex, the office features a café bordered by generous meeting rooms.

Urban Planning | Apr 12, 2023

Watch: Trends in urban design for 2023, with James Corner Field Operations

Isabel Castilla, a Principal Designer with the landscape architecture firm James Corner Field Operations, discusses recent changes in clients' priorities about urban design, with a focus on her firm's recent projects.

3D Printing | Apr 11, 2023

University of Michigan’s DART Laboratory unveils Shell Wall—a concrete wall that’s lightweight and freeform 3D printed 

The University of Michigan’s DART Laboratory has unveiled a new product called Shell Wall—which the organization describes as the first lightweight, freeform 3D printed and structurally reinforced concrete wall. The innovative product leverages DART Laboratory’s research and development on the use of 3D-printing technology to build structures that require less concrete. 

Market Data | Apr 11, 2023

Construction crane count reaches all-time high in Q1 2023

Toronto, Seattle, Los Angeles, and Denver top the list of U.S/Canadian cities with the greatest number of fixed cranes on construction sites, according to Rider Levett Bucknall's RLB Crane Index for North America for Q1 2023.

University Buildings | Apr 11, 2023

Supersizing higher education: Tracking the rise of mega buildings on university campuses

Mega buildings on higher education campuses aren’t unusual. But what has been different lately is the sheer number of supersized projects that have been in the works over the last 12–15 months.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021