Eighty-two years after its founding by its storied namesake, the Frank Lloyd Wright School of Architecture is currently at risk of losing its accreditation.
According to Archdaily, the school no longer meets the revised requirements by the Higher Learning Commission, a non-profit group whose approval is mandatory for the National Architectural Accrediting Board's accreditation process.
The HLC by-laws were revised in 2012 so that colleges would require accreditation organizations other than the sponsoring one to accredit them.
The Frank Lloyd Wright School is currently funded as part of the Frank Lloyd Wright Foundation, Archdaily reports, which supports both of the school’s campuses and preserves an archive of Wrights work. Under the revised by-law, the Frank Lloyd Wright School of Architecture would need to file for incorporation as an institution with a primary purpose of offering higher education.
As of now, the school, located at Taliesin West in Scottsdale, Ariz., and Taliesin in Spring Green, Wis., will retain its accreditation through 2017, but it must find an accredited institution to partner before then to offer an advanced architecture degree and maintain accreditation, USA Today reports.
“I’m disappointed. I’m frustrated,” the Frank Lloyd Wright Foundation’s president, Sean Malone, told USA Today. “That said, I’m not worried about there not being any interest in a partnership.”
Related Stories
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
| Dec 12, 2011
AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year
SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment.
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.