flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Frank Lloyd Wright’s Taliesin school of architecture faces accreditation loss

Frank Lloyd Wright’s Taliesin school of architecture faces accreditation loss

If the school does not find a partner institution before 2017, Taliesin School may lose its ability to confer Master of Architecture students.


By BD+C Staff | August 27, 2014
Taliesin, Frank Lloyd Wright School at risk of losing accreditation
Taliesin, Frank Lloyd Wright School at risk of losing accreditation

Eighty-two years after its founding by its storied namesake, the Frank Lloyd Wright School of Architecture is currently at risk of losing its accreditation.

According to Archdaily, the school no longer meets the revised requirements by the Higher Learning Commission, a non-profit group whose approval is mandatory for the National Architectural Accrediting Board's accreditation process.

The HLC by-laws were revised in 2012 so that colleges would require accreditation organizations other than the sponsoring one to accredit them.

The Frank Lloyd Wright School is currently funded as part of the Frank Lloyd Wright Foundation, Archdaily reports, which supports both of the school’s campuses and preserves an archive of Wrights work. Under the revised by-law, the Frank Lloyd Wright School of Architecture would need to file for incorporation as an institution with a primary purpose of offering higher education.

As of now, the school, located at Taliesin West in Scottsdale, Ariz., and Taliesin in Spring Green, Wis., will retain its accreditation through 2017, but it must find an accredited institution to partner before then to offer an advanced architecture degree and maintain accreditation, USA Today reports.

“I’m disappointed. I’m frustrated,” the Frank Lloyd Wright Foundation’s president, Sean Malone, told USA Today. “That said, I’m not worried about there not being any interest in a partnership.”

Related Stories

| Jun 1, 2012

AIA 2030 Commitment Program reports new results

The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.

| Jun 1, 2012

Robert Wilson joins SmithGroupJJR

Wilson makes the move to SmithGroupJJR from VOA Associates, Inc., where he served as a senior vice president and technical director in its Chicago office.

| Jun 1, 2012

Gilbane Building's Sue Klawans promoted

Industry veteran tasked with boosting project efficiency and driving customer satisfaction, to direct operational excellence efforts.

| Jun 1, 2012

Ground broken for Children’s Hospital Colorado South Campus

Children’s Hospital Colorado expects to host nearly 80,000 patient visits at the South Campus during its first year.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

| Jun 1, 2012

New York City Department of Buildings approves 3D BIM site safety plans

3D BIM site safety plans enable building inspectors to take virtual tours of construction projects and review them in real-time on site.

| May 31, 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.

| May 31, 2012

8 steps to a successful BIM marketing program

It's not enough to have BIM capability--you have to know how to sell your BIM expertise to clients and prospects.

| May 31, 2012

3 Metal Roofing Case Studies Illustrate Benefits

Metal roofing systems offer values such as longevity, favorable life cycle costs, and heightened aesthetic appeal.

| May 31, 2012

AIA Course: High-Efficiency Plumbing Systems for Commercial and Institutional Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021