flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Frank Lloyd Wright’s Taliesin school of architecture faces accreditation loss

Frank Lloyd Wright’s Taliesin school of architecture faces accreditation loss

If the school does not find a partner institution before 2017, Taliesin School may lose its ability to confer Master of Architecture students.


By BD+C Staff | August 27, 2014
Taliesin, Frank Lloyd Wright School at risk of losing accreditation
Taliesin, Frank Lloyd Wright School at risk of losing accreditation

Eighty-two years after its founding by its storied namesake, the Frank Lloyd Wright School of Architecture is currently at risk of losing its accreditation.

According to Archdaily, the school no longer meets the revised requirements by the Higher Learning Commission, a non-profit group whose approval is mandatory for the National Architectural Accrediting Board's accreditation process.

The HLC by-laws were revised in 2012 so that colleges would require accreditation organizations other than the sponsoring one to accredit them.

The Frank Lloyd Wright School is currently funded as part of the Frank Lloyd Wright Foundation, Archdaily reports, which supports both of the school’s campuses and preserves an archive of Wrights work. Under the revised by-law, the Frank Lloyd Wright School of Architecture would need to file for incorporation as an institution with a primary purpose of offering higher education.

As of now, the school, located at Taliesin West in Scottsdale, Ariz., and Taliesin in Spring Green, Wis., will retain its accreditation through 2017, but it must find an accredited institution to partner before then to offer an advanced architecture degree and maintain accreditation, USA Today reports.

“I’m disappointed. I’m frustrated,” the Frank Lloyd Wright Foundation’s president, Sean Malone, told USA Today. “That said, I’m not worried about there not being any interest in a partnership.”

Related Stories

| May 8, 2013

NBBJ appoints Tim Leberecht Chief Marketing Officer

NBBJ, a global architecture and design firm, today announced that it has appointed Tim Leberecht as its Chief Marketing Officer. Leberecht joins NBBJ from Frog Design where he led the marketing organization from 2006 to 2013 and helped transform the company into one of the world’s foremost design and innovation consultancies.

| May 7, 2013

First look: Golden State Warriors stadium by Snøhetta, AECOM

Architects Snøhetta and AECOM have revealed their latest renderings of a new stadium for NBA basketball team the Golden State Warriors on the waterfront in San Francisco. 

| May 7, 2013

Renovated bridge building will anchor Nashville riverfront master plan

Renovations to the former Nashville Bridge Company building were recently completed, including a newly-built modern wing. The facility has been re-dubbed The Bridge Building and now offers spaces for meetings, parties, weddings, and other events.

| May 7, 2013

First look: Adrian Smith + Gordon Gill skyscraper designed to 'confuse the wind'

The 400-meter-high, 116-story Imperial Tower in Mumbai will feature a slender, rounded form optimized to withstand the area's strong wind currents.

| May 6, 2013

SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems

SAFTI FIRST, leading USA-manufacturer of fire rated glass and faming systems, is proud to announce that Autodesk Revit models are now available for its fire rated walls, window and door systems via www.safti.com and Autodesk Seek.

| May 6, 2013

7 major multifamily residential projects in the works

A $140 million redevelopment of a landmark, 45-building apartment complex in Los Angeles is among the nation's significant multifamily developments under way.

| May 3, 2013

5 common failures in paints and coatings

As experienced designers, contractors, and owners know, most paint and coating problems are correctable, but some are especially stubborn to address. Here is a partial compendium of typical failure modes and methods for addressing the problem.

| May 3, 2013

'LEED for all GSA buildings,' says GSA Green Building Advisory Committee

The Green Building Advisory Committee established by the General Services Administration, officially recommended to GSA that the LEED green building certification system be used for all GSA buildings as the best measure of building efficiency.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021