flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Frank Lloyd Wright’s architecture school is closing

Architects

Frank Lloyd Wright’s architecture school is closing

The school was established in 1932.


By David Malone, Associate Editor | January 29, 2020

Frank Lloyd Wright's Fallingwater. Courtesy Pixabay.

The School of Architecture at Taliesin will close after 88 years after an agreement with the Frank Lloyd Wright Foundation was unable to be reached.

Established in 1932 by Frank Lloyd Wright, the school was integral to fostering Wright’s vision of “organic architecture.” Over 1,200 architects have lived, worked, and studied at the school since its founding. Students would split their time between Wright’s retreats housed at Taliesin West in Scottsdale and Taliesin in Spring Green, Wis.

“This is a sad and somber day for our school, our students and staff and the architecture community. We are saddened we could not reach an agreement with the Frank Lloyd Wright Foundation to continue operating the architecture school. Our innovative school and its mission were integral to Frank Lloyd Wright’s vision for connecting architecture to our natural world. Wright’s legacy was not just building. It was a school to promulgate the lessons for all future generations,” said Dan Schweiker, Chairperson of the Board of Governors for the School of Architecture at Taliesin.

 

See Also: Watch Frank Lloyd Wright and Buckminster Fuller discuss architecture in animated video shorts

 

The School of Architecture at Taliesin will operate during the Spring 2020 semester before officially closing by the end of June. The school is working out an agreement with The Design School at Arizona State University’s Herberger Institute for Design and the Arts so students can transfer credits and complete their degree programs.

Tags

Related Stories

Healthcare Facilities | Jun 20, 2022

Is telehealth finally mainstream?

After more than a century of development, telehealth has become a standard alternative for many types of care.

Building Team | Jun 20, 2022

Andres Caballero Appointed President of Uponor North America

Uponor Corporation (Uponor) has named Andres Caballero president of its Building Solutions – North America division and a member of the Executive Committee at Uponor.

| Jun 20, 2022

An architectural view of school safety and security

With threats ranging from severe weather to active shooters, school leaders, designers, and security consultants face many challenges in creating safe environments that allow children to thrive.

School Construction | Jun 20, 2022

A charter high school breaks ground in L.A.’s Koreatown

A new charter school has broken ground in Los Angeles’ Koreatown neighborhood.

Building Team | Jun 17, 2022

Data analytics in design and construction: from confusion to clarity and the data-driven future

Data helps virtual design and construction (VDC) teams predict project risks and navigate change, which is especially vital in today’s fluctuating construction environment.

Sports and Recreational Facilities | Jun 17, 2022

U. of Georgia football facility expansion provides three floors for high-performance training

A major expansion of the University of Georgia’s football training facility has been completed.

Building Team | Jun 16, 2022

Hybrid work expected to reduce office demand by 9%

Businesses are slowly but consistently transitioning to a permanent hybrid work environment, according to a senior economist at Econometric Advisors.

Building Team | Jun 16, 2022

USGBC announces more than 23 million square feet of LEED certified net zero space

Today, the U.S. Green Building Council announced nearly 100 net zero certifications earned under the LEED Zero program, representing more than 23 million square feet of space.

AEC Business Innovation | Jun 15, 2022

Cognitive health takes center stage in the AEC industry

Two prominent architecture firms are looking to build on the industry’s knowledge base on design’s impact on building occupant health and performance with new research efforts.

Market Data | Jun 15, 2022

ABC’s construction backlog rises in May; contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator increased to nine months in May from 8.8 months in April, according to an ABC member survey conducted May 17 to June 3. The reading is up one month from May 2021.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021