Not even a decade ago, the cost to recast the handmade cement block structures of Frank Lloyd Wright’s Annie Pfeiffer Chapel on the campus of a Florida Southern College was prohibitively expensive.
But today, as 3D printing technology improves and becomes more affordable, the Annie Pfeiffer Chapel was recently restored in precise architectural detail, Design Milk reports.
The chapel was constructed using Wright’s signature textile block building system, utilizing student labor in the years between 1938 to 1941. More than 6,000 tapestry blocks decorated into 46 unique designs were individually cast from coquina and concrete.
Thanks to a $50,000 grant from the Florida Division of Historical Resources and a $350,000 grant provided by the Save America’s Treasurers Program of the National Park Service, the chapel’s splendor was restored. The Florida Southern College reports that by using 3D printers purchased with these grants, restorers were able to create molds for the intricate concrete blocks that were originally constructed by hand.
Consistent with Wright’s original design, 2,000 distinctive colored glass tiles were created and inserted into the manufactured blocks.
Learn more on the chapel’s restoration and see the equipment in action at Florida Southern College news.
Related Stories
Multifamily Housing | Sep 15, 2022
Heat Pumps in Multifamily Projects
RMI's Lacey Tan gives the basics of heat pumps and how they can reduce energy costs and carbon emissions in apartment projects.
| Sep 15, 2022
Monthly construction input prices dip in August
Construction input prices decreased 1.4% in August compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics Producer Price Index data released today.
| Sep 15, 2022
First LEED Platinum, net zero and net zero water synagogue opens
Kol Emeth Center, the world’s first LEED Platinum, net zero and net zero water synagogue, opened recently in Palo Alto, Calif.
| Sep 14, 2022
Fires on Amazon warehouse roofs seemingly caused by faulty PV installations
Amazon has made installing solar panels on rooftops a key part of its ESG strategy, but a series of events last year show how challenging greening up major facilities can be.
| Sep 14, 2022
Indian tribe’s new educational campus supports culturally appropriate education
The Kenaitze Indian Tribe recently opened the Kahtnuht’ana Duhdeldiht Campus (Kenai River People’s Learning Place), a new education center in Kenai, Alaska.
| Sep 13, 2022
California building codes now allow high-rise mass-timber buildings
California recently enacted new building codes that allow for high-rise mass-timber buildings to be constructed in the state.
| Sep 13, 2022
Orange County opens civic center complex—one of California’s largest P3 projects
Orange County’s recently opened County Administration North (CAN) building caps an urban center development that constitutes one of California’s largest ever P3 projects.
Laboratories | Sep 12, 2022
Lab space scarcity propels construction demand in life sciences sector
In its 2021 Life Sciences Real Estate Outlook, JLL predicted that access to talent would be a primary concern for an industry sector that had been growing by leaps and bounds. A year later, talent still guides real estate decisions. But market conditions of a different sort were cooling the biotech field: namely, investors that have soured on startups which underperformed after going public. What this means for new construction and renovation going forward is unpredictable, as the drivers behind life sciences’ surge are still palpable.
Architects | Sep 12, 2022
FWA Group joins national architecture, interior design, and planning firm Hord Coplan Macht
Hord Coplan Macht acquires FWA Group.
| Sep 12, 2022
Staff at New York City architecture firm is first in U.S. to unionize
Staff at New York City architecture firm is first in U.S. to unionize.